Similar Projects
Dutton Creek Road Cattle Guard Replacement Project
Infrastructure
Bidding
$350,000 est. value
Laramie, WY

As Needs Asphalt Repair - Laramie County Community College and Cheyenne Regional Airport Leased Space
Infrastructure
Bidding
Cheyenne, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Greybull - Lovell (US 310 / WYO 789)
Infrastructure
Results
Greybull, Lovell, WY

USFS Cold Springs Road Improvement, Hyatteville, Wy
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Buffalo, Sheridan, WY 82834

District 3 Crack Seal
Infrastructure
Results

WY Flap 704(1) Skyline Drive & Fremont Lake Road
Term Contract
Post-Bid
Pinedale, WY 82941

Last Updated 07/15/2022 03:37 AM
Project Title

Teton County Chip Seal Project

Physical Address View project details and contacts
City, State (County) Alta, WY 83414   (Teton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Invitation for Bids for application of both chip seal and fog seal treatment on three (3) County roads and application of fog seal treatment only on three (3) County roads, all located in the Alta area of Teton County, Wyoming. The project generally consists of surface preparation, chip seal application, fog seal application, pavement striping, and associated incidentals. The three (3) County roads requiring both chip seal and fog seal treatment are Ski Hill Road, State Line Road paved section, and a portion of Alta North Road, totaling approximately 6.4 miles in length. The three (3) County roads requiring fog seal treatment only are Targhee Towne Road, Greenville Road paved section, and Alta School Road, totaling approximately 2.3 miles in length. Start and final completion dates for construction are July 7, 2022 and August 19, 2022, respectively.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents