Similar Projects
Sanitary Sewage Pumping Station Improvements
Renovation
Bidding
$850,000 est. value
Elizabeth City, NC

Pump Station No. 7 And Manhole Rehabilitations
Renovation
Bidding
Denver, NC 28037

Holly Ridge Pump Station
Post-Bid
Fuquay-Varina, NC 27526

Unionville Pump Station Replacement
Post-Bid
Monroe, NC 28110

Snow Hill Road Pump Station and Force Main Replacement
New Construction
Results
Less than $1,899,449 est. value
Durham, NC 27701

Lang Street Pump Station Replacement
Results
Haw River, NC 27258

NHRMC Emergency Well House
New Construction - 1,211 SF
Construction
$68,323 est. value
Wilmington, NC 28403

Pump Station #26 And Pump Station #27 Improvements
New Construction
Construction
$500,000 est. value
Wilmington, NC 28401

I-40 Pump Station Improvements
Renovation
Bidding
Cary, NC

Magnolia Greens Lift Station #1 Relocation
Post-Bid
Leland, NC 28451

OMC Pump Station and Water Treatment Plant Improvements
Results
Less than $1,000,000 est. value
Burnsville, NC 28714

Pump Station 7 and Manhole Rehabilitations
Renovation, Infrastructure
Bidding
Lincolnton, NC

On-Call Corrective Maintenance and Repair Service
Term Contract
Post-Bid
Charlotte, NC

Regional Pump Station 33 and Force Main Extension
Results
Less than $2,692,677 est. value
Williamston, NC

Piedmont Innovation Pump Station and Force Main
New Construction
Bidding
NC

Last Updated 07/16/2021 11:49 AM
Project Title

Riverdale Sewer Lift Station Odor Control Improvements

Physical Address View project details and contacts
City, State (County) High Point, NC   (Guilford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work at the Riverdale Lift Station to be performed under this Contract includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: 1. Construction and installation of new packaged odor control facility. 2. Installation of new foul air piping. 3. Demolition and rerouting of existing piping. Installation of new foul air pipe to existing station. Demolition of existing piping and any existing wiring related to the odor control system being replaced. Disposal of the existing odor control facility. 4. Work includes but is not limited to excavation, backfill, pipe install, painting, equipment suppling and installation, electrical conduit, wiring and additional appurtenances as required for the successful operation of the new Odor Control Facility.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents