Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

Test Wells Project
Infrastructure
Bidding
$180,000 CJ est. value
Cedar City, UT 84720

Music Center Renovation and Addition Southern Utah University
Addition, Demolition, Renovation, Infrastructure
Bidding
$15,000,000 CJ est. value
Cedar City, UT 84720

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Snowshoe and Toboggan Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

Quichapa Well 6 Waterline Replacement Project
Infrastructure
Results
$700,000 est. value
Cedar City, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

Southern Utah University New Hay Shed
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Cedar City, UT 84720

Forest and Falcon Waterline Project
Infrastructure
Post-Bid
Brian Head, UT

DFCM Construction-Standard Low Bid-Old Iron Towns Site
Infrastructure
Results
$160,000 est. value
Cedar City, UT 84720

Cedar City Pickleball Complex Project - 2022
New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Cedar City, UT 84720

Well Equipping Project
Infrastructure
Results
$499,410 CJ est. value
Cedar City, UT 84720

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Last Updated 10/13/2022 10:31 AM
Project Title

Canyon Sewer Line Capacity Project

Physical Address View project details and contacts
City, State (County) Brian Head, UT 84719   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Brian Head Town is seeking sealed bids for the Brian Head Canyon Sewer Line Capacity Project. The project consists of the construction of approximately 3,500 linear feet of 12" sewer pipe and 20 manholes along UT143. The project is anticipated to be bid in February 2023. Brian Head Town reserves the right to reject any or all bids or waive any irregularity. The method of Contractor Selection has not been Determined at this time

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents