Similar Projects
Pequea Boulevard Resurface
Infrastructure
Conception
Pequea, PA 17565

Blue Bell Mobile Home Park
New Construction
Design
Ephrata, PA 17522

Fritz Avenue Subdivision
New Construction
Design
Quarryville, PA 17566

Paving Work at Solanco High School, Smith Middle School, Swift Middle School and Bart Elementary
Post-Bid
Quarryville, PA 17566

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Superpave, Milling
Results
Lancaster, PA

Sidewalk, Curb and Drainage Maintenance on East Main Street (SR 772) and North Water Street (SR 1035) and Watermain Replacement on Water Street Roadway and Reconstruction
Results
Lititz, PA 17543

Meadia Heights Golf Course Pool and Restaurant
New Construction, Renovation - 1,800 SF
Construction
Lampeter, PA 17537

Brent L Miller Jewelers
Infrastructure
Construction
Lancaster, PA 17601

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Garden Spot Village / Ranck Road
New Construction, Infrastructure - 68,000 SF
Pending Verification
$8,500,000 CJ est. value
New Holland, PA 17557

Circle M RV Campground and Resort
Renovation
Design
Lancaster, PA 17603

North Penryn Road Widening, Newport Road To Oak Lane
Post-Bid
$138,000 est. value
Manheim, PA

Maytown Fire Department Parking Lot
Results
Marietta, PA

Furnace Road
Infrastructure
Post-Bid
Quarryville, PA

Last Updated 09/13/2022 12:40 AM
Project Title

2022 Street Improvements

Physical Address View project details and contacts
City, State (County) Ephrata, PA 17522   (Lancaster County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $569,085 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work shall consist of, but not be limited to, furnishing all required bonds, insurances and required forms, general superintendence, labor, materials, equipment, appurtenances and incidentals required for completion of the prescribed street improvements, including, but not limited to: ADA ramp installations, storm water catch basin replacements, pavement base repairs, mechanical milling approximately 16,800 SY of existing asphalt pavement surfaces, asphalt overlay approximately 16,800 SY of milled pavement surfaces, 980 SY of pavement reconstruction, pavement markings, traffic control including establishment of approved detour routes and all else necessary or required. Each bid shall be accompanied by a bid bond in the required form, certified check, letter of credit, or other security acceptable to the Borough in the amount of 10 percent of the total base bid. The Contractor shall ensure that all employees and applicants for employment are not discriminated against because of their race, creed, color, age, religion, sex, or national origin. This contract is subject to current Pennsylvania Prevailing Wage Act conditions. This contract is subject to the Federal Occupational Safety & Health Act of 1970 (OSHA) conditions. This contract is subject to PA Act 127 (Public Works Employment Verification). Contractor must submit verification forms acknowledging compliance with the Federal law concerning the use of the E-Verify Program. Providing verification is a pre-condition of the award of the contract. In addition, prior to commencing work on the project, the Contractor shall submit all subcontractor verification forms. This contract is subject to Pennsylvania Human Relations Act 222 conditions. This contract is subject to the non-discrimination in Employment/Contract Compliance Regulations conditions. The Borough of Ephrata reserves the right to accept or reject any or all bids and to award the bid in the best interests of the Borough. CLARIFICATION DEADLINE 4/22/2022 12:00 PM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents