Similar Projects
Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

Lowell Creek Flood Diversion - US Army Corps of Engineers - Alaska District
Infrastructure
Design
$185,225,000 CJ est. value
Seward, AK 99664

RFP - Central Peninsula Landfill Master Plan
Infrastructure
Bidding
$200,000 CJ est. value
Soldotna, AK 99669

Whistle Hill Sewer Extension
Addition, Infrastructure
Bidding
$250,000 CJ est. value
Soldotna, AK 99669

Achemak Selo School - Kenai Peninsula Borough
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Fritz Creek, AK 99603

Salmon Creek Channel Excavation and Embankment Maintenance
Infrastructure
Post-Bid
$500,000 CJ est. value
Seward, AK 99664

M/V Lituya Coatings and Preservation
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value

South Bend Paving and Road Improvements
Infrastructure
Results
$632,688 CJ est. value
Soldotna, AK 99669

Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Moose Pass, AK 99631

Alaska Natural Gas Pipeline
New Construction, Infrastructure
Pending Verification
$43,400,000,000 CJ est. value
Nikiski, AK 99635

Lilac Street Repairs - City Of Kenai
Infrastructure
Conception
$393,000 CJ est. value
Kenai, AK 99611

Duke Street Capital Improvement Project
Infrastructure
Bidding
$100,000 CJ est. value
Nikiski, AK 99611

Mansfield Avenue CIP (S7MAN)
Infrastructure
Post-Bid
$300,000 CJ est. value
Fritz Creek, AK 99603

Skyline Drive Asphalt Rehabilitation
Infrastructure
Results
$344,805 CJ est. value
Soldotna, AK 99669

Last Updated 05/22/2023 08:05 AM
Project Title

Trail River Bridge Wearing Surface Repair

Physical Address View project details and contacts
City, State (County) Seward, AK 99664   (Kenai Peninsula County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Synopsis of Proposed Contract Action TRAIL RIVER BRIDGE WEARING SURFACE Kenai Peninsula, Alaska THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. This notice is for the issuance of a blanket purchase agreement call request on the "Northwest Zone Trail Maintenance and Construction BPA (1240BJ21A0021-49)" This is a competitive request for quotes under a previously issued BPA. We are not looking to add new contractors to the BPA at this time. -------------------------------------------------------------------------------------------------------------------- Action Code: Presolicitation Date: May 18, 2023 Contracting Office Address: Procurement and Property Services, Field Procurement Operations, Northwest Procurement Zone Product or Service Code: Z2LB NAICS Code: 237310 Proposed Solicitation Number: 1240BJ23Q0024 Closing Response Date: June 2, 2023 Contact Point or Contracting Officer: Roxanne Anderson Place of contract performance: Kenai Peninsula, Alaska Description: This project is for bridge decking removal services on the Forest Service Trail River Bridge on the Seward Ranger Districts in Southcentral Alaska within the Kenai Peninsula Borough. Performance for this requirement includes cleaning all debris from the running surface and removal of wear surface running planks. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government. Outline of Services: The Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS). Project Location: The project work is located approximately mile 0.4 of Trail River Road, South of Moose Pass, Alaska, Mile post 24.2 of the Seward Highway. Background: The Trail River Bridge is approximately 140'3" long with a 22'1" clear width between curbs. This bridge provides access to the Forest Service Campground on the west side of Trail River. The current wear surface has been exposed to weather and traffic, and as a result has become deteriorated and in some locations, exposing the spike nails used as fasteners. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents