Similar Projects
Moving Portable Buildings Districtwide
Term Contract
Sub-Bidding
Greenville, SC 29605

Furnish and Deliver Trash Can Liners to Locations Districtwide
Term Contract
Sub-Bidding
Taylors, SC 29687

Public Works Limb and Brush Debris Pile Removal
Term Contract
Post-Bid
Fort Mill, SC 29715

Toilet Pumping Services for Sassafras Mountain
Term Contract
Post-Bid
Greenville, SC 29601

Signing - Lower State (On-Call)
Term Contract
Post-Bid
Conway, SC 29526

Dedicated Outside Air System (DOAS) Unit Maintenance Program
Term Contract
Post-Bid
Taylors, SC 29687

Turf Maintenance Products
Term Contract
Post-Bid
Greer, SC 29651

Bridge Parts
Term Contract
Post-Bid
Greenville, SC 29601

Grout for Maintenance Operations
Term Contract
Post-Bid
Simpsonville, SC 29681

Solid Waste Hauling Services
Term Contract
Post-Bid
Greenville, SC 29601

Steel H Maintenance Operations
Term Contract
Post-Bid
Simpsonville, SC 29681

Swamp Rabbit Trail Landscape Maintenance
Term Contract
Post-Bid
Greenville, SC 29601

Pile Jackets for Maintenance Operations
Term Contract
Post-Bid
Simpsonville, SC 29681

Ground Support Equipment
Term Contract
Post-Bid
Greer, SC 29651

Provide Security Camera Services for Municipal Buildings and Properties
Term Contract
Post-Bid
Fountain Inn, SC 29644

Last Updated 05/23/2023 06:33 PM
Project Title

Greer High School - Roof Recover/ Replacement

Physical Address View project details and contacts
City, State (County) Greer, SC 29651   (Greenville County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,550,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Greenville County School District prequalifies roofing companies through a Questionnaire that they submitted at the beginning of the year - only these companies are allowed to bid. This project involves a roof recover and/or replacement of approximately 189,920 square feet of existing gravel surface built-up roof system at Greer High School. Included in this project is the replacement of the existing storefront system at the Art Room. At Roof Areas A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11 and A12 the contractor will remove and properly dispose of the existing aggregate, cant strips, and base flashing as required to provide a smooth substrate for the application of the new recover roof systems. At Roof Areas B1, B2, B3 and B4; the contractor will remove and discard the existing built-up roof system to include membrane, roofing felts, asphalt, insulation, and bituminous flashing down to the existing cementitious wood fiber deck. At all roof areas the contractor will remove and properly dispose the following: 1. Existing metal flashing, including lead flashing, scupper liners, expansion joints covers, coping and counter flashing. 2. Existing gutters and downspouts. Existing pipe flashing including lead flashings and pitch pans. 3. Abandoned penetrations in the deck as marked on the drawings or on the roof. At Roof Area A4, the contractor will remove and properly dispose of existing drain bowl assemblies. All roof areas Existing curbs to be raised to a minimum finished flashing height of 8- inches above the finished roof. Existing gas lines to be scraped, primed and painted. PVC condensation lines to be replaced with copper condensation lines. Water test all internal roof drains, scuppers and downspouts prior to any work and report any blockage or impediments to drainage to Greenville County Schools and Raymond Engineering, submit pre-work water test results to Designer for record. Questions or comments regarding this solicitation document or the process shall be forwarded, in writing, to Ms. Tonya A. Stroud, Senior Buyer, and Ms. Valarie Southerlin, Buyer, 2 Space Drive, Taylors, South Carolina 29687. Email addresses are: tstroud@greenville.k12.sc.us and vsouther@greenville.k12.sc.us. Inquiries and comments shall be delivered to the Procurement Department no later than May 9, 2023, at 10:00 AM EDT. Verbal questions/comments shall not be addressed at any time. Roof Areas A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, A11 and A1; furnish and install new 80-mil adhered TPO roof system, adhered cover boards and mechanical fastening enhancements as specified. At Roof Areas B1, B2, B3 and B4; furnish and install new 80-mil TPO roof system, adhered cover board and two layers of adhered isocyanate insulation as specified. At Roof Area A4, furnish and install new drain bowl assemblies to match the existing size as specified. At all roof areas furnish and install the following: - Existing curbs to be raised to a minimum finished flashing height of 8- inches above the finished roof. -Extend soil vent pipes to a minimum finished flashing height of 8-inches above the new roof. - New wood blocking at roof eaves and rake edges to match the level of the new roof.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents