Similar Projects
State Route 133 Sanitary Pump Station
New Construction
Bidding
$375,000 est. value
Williamsburg, OH 45176

Wales Road Clearwell Flow Meter Improvements
New Construction
Bidding
Less than $120,000 est. value
Rossford, OH 43460

Blue Fountain Lift Station Pump Replacement
Post-Bid
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Post-Bid
Lima, OH

Sunrush Pump Station Improvements
Results
Less than $390,000 est. value
Chillicothe, OH

Castleberry Lift Station Upgrade
Results
Milford, OH 45150

Williams Pumping Station Replacement Project
Construction
Less than $1,263,053 est. value
Napoleon, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Aetnaville Water Pumping Station
New Construction - 513 SF
Bidding
Bridgeport, OH 43912

Rickenbacker Logistics Park Public Infrastructure
Post-Bid
Ashville, OH 43103

WWTP Collection Improvements Phase I Pump Station and Trunk Sewer Replacement
Results
$3,300,000 est. value
Nelsonville, OH 45764

Floral Valley and Bel Capri Sewage Lift Station Replacements
New Construction
Bidding
Bridgeport, OH

Wightman's Grove Wastewater Treatment Plant
Post-Bid
Less than $995,000 est. value
OH

Jackson County – Milton Township Water Station
Results
Jackson, OH 45640

9th Street Wastewater Pump Station Improvements
New Construction
Bidding
$494,000 est. value
Genoa, OH

Reported 02/03/2021 12:00 AM
Project Title

Replace and Construct Type III Hydrant Fuel System

Physical Address View project details and contacts
City, State (County) Wright Patterson Air Force Base, OH   (Greene County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Design-Build.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a new Type III Hydrant System with two 5,000-barrel aboveground storage tanks and a 2,400 GPM pump house, and issue/return piping 12-inch hydrant loop. The existing hydrant loop with 14 in-apron hydrant pits shall remain in service. Project demolition will include removal of four 50,000-gallon underground storage tanks and the Type II pumphouse. The project will also construct a single-position emergency/secondary truck offload stand, hydrant hose truck checkout stand, and product recovery tank. Associated features include access roads, concrete secondary containment, containment drainage, provisions for temporary pig launcher and receiver, control systems, security fencing, and lighting

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Site Containment, Gas Containment, Underground Storage Tank Removal.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Expansion Fittings and Loops for Plumbing Piping.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures, Fuel-Storage Tanks, Aboveground Fuel-Storage Tanks.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents