Similar Projects
New Wastewater Treatment Plant
New Construction
Design
$46,000,000 est. value
Charlestown, IN

Wastewater and Water Utility Improvements Division I - Wastewater Treatment Plant Maintenance Building
Renovation
Bidding
$528,000 est. value
Scottsburg, IN

North WRF Expansion
Addition
Bidding
$1,500,000 est. value
Jeffersonville, IN 47130

Wastewater Utility Rehabilitation
Post-Bid
Ladoga, IN 47954

Peak Excess Flow Treatment Facility
Post-Bid
Kokomo, IN

Wastewater Utilities Improvements
Results
Chesterfield, IN 46017

WWTP Rehabilitation and Expansion
Results
Sellersburg, IN

Wastewater Treatment Plant Improvements
New Construction
Bidding
$300,000 est. value
Greenfield, IN

West WWTP Renewable Natural Gas (RNG) System
Post-Bid
Evansville, IN

Wastewater Utility Improvements
New Construction
Results
$425,929 est. value
Versailles, IN

Boone Grove High School - New Wastewater Treatment Plant
New Construction
Bidding
$650,000 est. value
Valparaiso, IN 46385

Phosphorus Removal Chemical Building
Addition
Post-Bid
Linton, IN

Phosphorus Removal Upgrades
Results
Spencer, IN

Lagrange County Regional Utility District Region C Wastewater Project - Phase II / Contract A and B
Renovation
Bidding
$300,000 est. value
Lagrange, IN

Waste Water Treatment Plant Capacity Upgrades – Phase 2
New Construction
Post-Bid
Elkhart, IN

Last Updated 05/26/2022 03:47 PM
Project Title

Wastewater Improvements – Div B – Collection System

Physical Address View project details and contacts
City, State (County) Cannelton, IN 47520   (Perry County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the Adams Street lift station, upgrade of the 4th Street lift station, installation of approximately 3,168 lineal feet of 10-inch force main from the 4th Street lift station to the new wastewater treatment plant, rehabilitation / replacement of select sections of gravity sewer, and installation of new manholes on existing sewers. The work includes all dewatering, bypass pumping, traffic control, temporary erosion and sediment control, surface restoration, and all other work required to make fully complete and operational.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents