Similar Projects
Request for Contractor Prequalifications
Renovation, Infrastructure
Bidding
Thornton, CO

Water Rehabilitation and Restoration - Service Saddle Replacement Program
Infrastructure
Bidding
Monument, CO 80132

South Platte Water Quality Modeling
Post-Bid
Denver, CO

Fenno Wellhouse Replacement
Post-Bid
Vail, CO 81657

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Waterline Improvement Project - 2020
Results
Windsor, CO 80550

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Lead Reduction Program Continuation
Infrastructure
Bidding
Denver, CO

Repair of 12 Inch Waterline - Piney creek Crossing at Saddle Rock Golf Course
Post-Bid
$380,000 est. value
Aurora, CO 80016

Y--Aspen Canal Pipeline
Results
Hotchkiss, CO 81419

SWMWSD - 2022 DCIP Sanitary and Water Main Replacement Project
Infrastructure
Bidding
$510,000 est. value
Littleton, CO

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$300,000 to $400,000 est. value
Estes Park, CO 80517

Daisy Circle Waterline Replacement
Results
Mount Crested Butte, CO 81224

2022 Pressure Relief Valve (PRV) Vault Improvements
Infrastructure
Bidding
$875,000 est. value
Aurora, CO 80011

Edwards Transmission Main - Phase IIB
Post-Bid
Vail, CO

Last Updated 05/05/2022 02:37 PM
Project Title

West 9th Street Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) Durango, CO 81303   (La Plata County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $525,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to replace approximately 765 LF of 4-inch water main with 8-inch C-900 DR18 PVC water main on in a developed commercial neighborhood along W 9th St between Camino del Rio and Main Av using conventional open trench installation methods and bore/rock drill installation method at railroad crossing. Project also includes replacement of watermain appurtenances as indicated, select water service lines to the back edge of sidewalk, concrete and asphalt pavement replacement, and landscape restoration. Work will include removal and replacement of Portland Cement Concrete (PCC) Pavement in Camino del Rio (US 550) per CDOT specifications and requirements. Construction support including Traffic Control and Erosion and Pollution Control are included contract requirements. Work includes trench excavation; waterline placement, testing, disinfection and connection to the existing water system in numerous locations; replacing water valves and fire hydrant(s) as indicated. The existing sidewalk and curb & gutter is to remain; services are to be bored under the flatwork via line splitting. Contractor to start work on W 9th St at Camino del Rio, completing new line tie in and existing line capping and any other work within the CDOT ROW as soon as practicable. Atmos Gas is also scheduled to replace the gas line along W 9th St near E 2nd Av in Spring-Summer 2022. Scheduling is critical on this project, and work is to be completed by September 3, 2022.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents