Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 CJ est. value
Bucyrus, KS 66013

Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 CJ est. value
Bucyrus, KS 66013

2022 Bond - Paola USD 368
Addition, Demolition, Renovation, Infrastructure
Design
$40,000,000 CJ est. value
Paola, KS 66071

Quivira Road: 183rd Street to 187th Street - TH-1147 - City of Overland Park
Infrastructure
Design
$2,940,000 CJ est. value
Overland Park, KS 66013

2023 Street Improvements Brown Avenue (12th to 7th)
Infrastructure
Bidding
$2,000,000 CJ est. value
Osawatomie, KS 66064

2023 Street Improvements Brown Avenue (12th to 7th)
Infrastructure
Bidding
$2,000,000 CJ est. value
Osawatomie, KS 66064

2022 Crack Seal
Infrastructure
Post-Bid
$60,000 CJ est. value
Louisburg, KS 66053

2022 Crack Seal
Infrastructure
Post-Bid
$60,000 CJ est. value
Louisburg, KS 66053

2021 - 2022 Sidewalk Repairs & Improvements
Infrastructure
Results
Lenexa, KS

K-68 - Grading and Surfacing
Infrastructure
Results
KS

2022 Asphalt Streets Resurfacing Project
Infrastructure
Construction
$217,989 CJ est. value
Osawatomie, KS 66064

2022 Asphalt Streets Resurfacing Project
Infrastructure
Construction
$217,989 CJ est. value
Osawatomie, KS 66064

207th Street Storage
Addition, Demolition, Infrastructure - 24,525 SF
Pending Verification
$2,200,000 CJ est. value
Bucyrus, KS 66013

Dog Park - City of Louisburg
Infrastructure
Conception
$50,000 CJ est. value
Louisburg, KS 66053

Stormwater Improvements - City of Louisburg
Infrastructure
Design
$3,481,000 CJ est. value
Louisburg, KS 66053

Last Updated 04/17/2023 09:01 PM
Project Title

RFP - 2023 Concrete Repair - Louisburg, KS

Physical Address View project details and contacts
City, State (County) Louisburg, KS 66053   (Miami County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $430,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of curbs and flatwork as follows: 1. Provide all labor and materials to construct the curbs and flatwork as shown on attached drawing. 2. Contractor will use AB3 if needed for base. 3. Curbs shall be stand-up type "B" and have 3 #4 rebar's. 4. Sidewalks shall have 3 #4 rebar lengthwise with crossbars. Rebar shall be on chairs. Sidewalks shall be 3 1/2" thick minimum. A 6-foot-wide sidewalk shall be provided. Sidewalk elevation shall match existing storm sewer inlet. 5. All concrete shall be KCMMB Granite 4500 psi mix. Concrete mix shall be submitted and approved before pouring. 6. Grading will be done by Contractor 7. Two-year Maintenance Bond 8. Contractor will put outdoor hangers no less than 2 days before the work is scheduled to start. All work will be marked with white paint. If you have any questions, please feel free to call Craig Hufferd, 913-238-6324.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents