Similar Projects
Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

CSC-20019; DSCC BLDG 27 Boiler Conversion
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Whitehall, OH 43213

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

HVAC and Mechanical Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH

Boiler Inspections New Buildings
Results
Columbus, OH

HCWP- Water Heater - R. Miller
Results
Columbus, OH

Greater Columbus Convention Center North Boiler Plant Replacement
Results
Less than $1,000,000 est. value
OH

Energy Efficiency Retrocommissioning
Results
Columbus, OH 43215

Karrer MS Boiler Replacement
Results
Less than $208,000 est. value
Dublin, OH 43016

FCBDD 2021 ECLC Boilers Replacement
Results
$120,000 est. value
Columbus, OH 43214

DOW OPS - 2.5 Gallon Electric Water Heaters
Results
Columbus, OH

Tremont Fountain Improvements
Results
Upper Arlington, OH 43221

UC ECUP Boilers 2 and 3
Alteration
Results
Less than $1,000,000 est. value
Columbus, OH 43224

SWWTP Boiler System Operational Improvements
Alteration
Results
Lockbourne, OH 43137

Last Updated 01/18/2022 07:26 AM
Project Title

DLA Building 10 Decentralized Boiler

Physical Address View project details and contacts
City, State (County) Whitehall, OH 43213   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves removing the existing steam heating system in the warehouse areas of the building 10 at Defense Supply Center Columbus, and installing a gas-fired hot water boiler system composed of three gas fired condensing boilers each with an input capacity of 4,000,000 BTUH to supply heat to the warehouse areas and to the air handling units serving the office areas. The air handling units currently have electric heating coils, and the installation desires to replace the electric heating coils with hot water coils.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents