Similar Projects
Art In Motion Charter School
Renovation, Addition - 111,000 SF
Conception
Chicago, IL 60649

Jesuit Academy Expansion
New Construction, Addition, Demolition, Alteration - 50,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Chicago, IL 60644

New Hope Academy Expansion
Build-Out - 9,600 SF
Design
Arlington Heights, IL 60004

2022 Mechanical Upgrades
Renovation
Bidding
Cicero, IL 60804

ICR Wendell Phillips Academy HS
Post-Bid
Chicago, IL 60653

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Oak Park & River Forest HS South Cafeteria Phase I
Renovation
Results
Oak Park, IL 60302

Disaster Recovery Services
Results

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

ICR - Ceiling Replacement at Roberto Clemente Community Academy High School
Results
Chicago, IL 60622

Maine South High School
Post-Bid
Park Ridge, IL

Maine East High School
Results
Park Ridge, IL 60068

Reported 02/11/2022 12:00 AM
Project Title

CPS Collins HS MEP

Physical Address View project details and contacts
City, State (County) Chicago, IL 60623   (Cook County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: Demolition, provision, and installation of HVAC equipment and accessories in addition to installation of equipment being procured through a separate pre-purchase contract. The work is for a complete project including, but not limited to, addressing impacts to existing conditions and delivering fully functioning and system connected equipment.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents