Similar Projects
Road Reconstruction (3R/4R Standards)
Infrastructure
Design
$2,130,000 CJ est. value
Angola, IN 46703

Road Reconstruction (3R/4R Standards)
Infrastructure
Design
$2,130,000 CJ est. value
Angola, IN 46703

2022 Street Improvements
Infrastructure
Post-Bid
Ashley, IN 46705

2022 Street Improvements
Infrastructure
Post-Bid
Fremont, IN 46737

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Hamilton CCMG Projects 2020-2
Results
Hamilton, IN

Comfort Station at Pokagon State Park
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Fremont, IN 46737

Hamilton Beach Restroom Facility and Site Improvements
Infrastructure
Results
Hamilton, IN

Steuben County Courthouse Bid Phase No.1: Earthwork and Structural
New Construction, Infrastructure
Post-Bid
Angola, IN 46703

2021 Street Improvement
Infrastructure
Results
Angola, IN 46703

Steuben County Courthouse Bid Phase No.3: Architectural and MEP
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Angola, IN 46703

Idiq, District Wide Bridge Maintenance
New Construction, Infrastructure
Results

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Hamilton Community Schools Tennis Courts
Infrastructure
Results
$500,000 est. value
Hamilton, IN 46742

Asphalt Resurface
Infrastructure
Results
IN

Last Updated 12/08/2022 02:24 AM
Project Title

Replace Superstructure

Physical Address View project details and contacts
City, State (County) Hamilton, IN 46742   (Steuben County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $936,836 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge over Matson Ditch, 1.19 miles Eof SR 427 As of December 08, 2022, the project is in Final Planning status. Anticipated letting date is November 16, 2022. INDOT - Replace Superstructure *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents