Similar Projects
Redfish Harbor
New Construction
Design
Pensacola, FL 32500

NED - Ship Single Family Housing Repair Project
Results
Less than $24,280 est. value
Pensacola, FL 32503

NED - Ship Single Family Housing Repair Project
Results
Less than $42,275 est. value
Pensacola, FL 32526

Inspired Living
New Construction - 60,000 SF
Construction
$60,000,000 est. value
Pensacola, FL

NED, SHIP Single Family Housing Repair Project at 405 Mapleleaf Circle
Results
Less than $9,600 est. value
Pensacola, FL 32514

NED SHIP Housing Repair for 1029 Webster Drive
Results
Pensacola, FL 32505

Rehabilitation of the Residential Dwelling
Results
Less than $56,100 est. value
Pensacola, FL 32506

NED CDBG Housing Repair for 1224 West Maxwell Street
Results
Pensacola, FL 32501

NED SHIP Housing Repair for 195 Pine Street
Results
Less than $31,510 est. value
Cantonment, FL 32533

NED SHIP Housing Repair for 201 Pine Street
Results
Less than $38,100 est. value
Cantonment, FL 32533

NED SHIP Housing Repair for 401 Washington Street
Results
Less than $23,850 est. value
Cantonment, FL 32533

NED SHIP Housing Repair for 4901 Kinnear Avenue
Results
Less than $32,500 est. value
Pensacola, FL 32506

NED Ship Housing Repair for 1506 Blossom Trail
Results
Less than $22,000 est. value
Pensacola, FL 32505

NED SHIP Housing Repair for 937 Broad Street
Results
Less than $6,400 est. value
Pensacola, FL 32534

NED SHIP Housing Repair for 7801 Amberidge Road
Results
Less than $31,710 est. value
Pensacola, FL 32534

Last Updated 04/06/2020 10:28 AM
Project Title

NED CDBG Housing Repair for 990 Muscogee Road

Physical Address View project details and contacts
City, State (County) Cantonment, FL 32533   (Escambia County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing wall tile and tub. Remove window, install framing and insulation. Install sheathing, house wrap and siding where window remove on exterior. Replace vanity and top with integrated sink. Cabinetry will be of like, kind and quality as example below. Cabinetry will be stained and finished with the homeowner selecting the color. Install knobs and pulls on new cabinets with the homeowner selecting the style. Cabinetry will be constructed of plywood with ½” plywood top, bottom and sides. Back is to be of 3/16” plywood with ½” hanger rails. Toe kick is ½” plywood. Stile and rails will be of solid wood. Doors can be plywood construction and drawer fronts solid wood. Replace entry door with trim and hardware. Repair walls and ceilings and texture to match surrounding area. Repair ceramic tile floor at new tub matching existing as close as possible. Install new 3-1/4” wood base and shoe moulding or 1/4 round. Install a new towel bar, a shower rod and a toilet paper holder. Install ceiling light fixture, model Hampton Bay FZP8012A or equivalent. Install wall mounted light fixture, model Hollywood Volume V1026-3 or equivalent. Remove and replace subfloor and underlayment, bringing new floor to existing grade. Lift floor framing as required to level floor, install new piers as required to support floor. Replace base cabinets approximately 27 lineal feet. Install approximately 33 linear feet of new standard grade post formed countertop with an incorporated back splash and caps and or end splashes in kitchen with homeowner selecting color. Cabinetry will be of like, kind and quality as example below. Cabinetry will be stained and finished with the homeowner selecting the color. Install knobs and pulls on new cabinets with the homeowner selecting the style. Cabinetry will be constructed of plywood with ½” plywood top, bottom and sides. Back is to be of 3/16” plywood with ½” hanger rails. Toe kick is ½” plywood. Stile and rails will be of solid wood. Doors can be plywood construction and drawer fronts solid wood. Repair walls and ceilings and texture to match surrounding area. Prep floor and install new vinyl floor allowing $30.00 per square yard for labor and material. Install new 3-1/4” wood base and shoe moulding or 1/4 round. Install ceiling light fixture, model Hampton Bay FZP8012A or equivalent. Prep, prime and paint walls, ceilings, woodwork and doors (all painted surfaces). Remove and replace subfloor and underlayment, bringing new floor to existing grade. Lift floor framing as required to level floor, install new piers as required to support floor. Repair walls and ceilings and texture to match surrounding area. Prep floor and install new vinyl floor allowing $30.00 per square yard for labor and material. Install new 3-1/4” wood base and shoe moulding or 1/4 round. Prep, prime and paint walls, ceilings, woodwork and doors (all painted surfaces). Remove existing wall tile and tub. Replace vanity and top with integrated sink. Cabinetry will be of like, kind and quality as example below. Cabinetry will be stained and finished with the homeowner selecting the color. Install knobs and pulls on new cabinets with the homeowner selecting the style. Cabinetry will be constructed of plywood with ½” plywood top, bottom and sides. Back is to be of 3/16” plywood with ½” hanger rails. Toe kick is ½” plywood. Stile and rails will be of solid wood. Doors can be plywood construction and drawer fronts solid wood. Replace entry door with trim and hardware. Repair walls and ceilings and texture to match surrounding area. Repair ceramic tile floor at new shower matching existing as close as possible. Install new 3-1/4” wood base and shoe moulding or 1/4 round. Install a new towel bar, a shower rod and a toilet paper holder. Install three 1-1/4” grab bars in shower area as per ADA recommendations. Install ceiling light fixture, model Hampton Bay FZP8012A or equivalent. Install new exhaust fan rated at a minimum of 70 CFM and Energy Star Qualified vented to the atmosphere as per Escambia County code. Prep, prime and paint walls, ceilings, woodwork and doors (all painted surfaces).

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents