Similar Projects
Highway Improvements
Infrastructure
Bidding
MN

Spring Lake Park Reserve Ravine Stabilization
Infrastructure
Bidding
Rosemount, MN 55068

NLH Pond Kettle Repair
Post-Bid
New London, MN 56273

Directional Boring
New Construction
Post-Bid
Minneapolis, MN 55401

Great Lakes National Program Office - Remediation
Results
Less than $300,000,000 est. value
Chicago, IL - Muskegon, MI - Duluth, MN

2020 Pond Maintenance
Results
Golden Valley, MN 55427

Bass Creek Restoration
Infrastructure
Bidding
$3,144,211 est. value
Brooklyn Park, MN 55428

Bluff 25 Culvert Replacement
Post-Bid
Eden Prairie, MN

Culvert Replacement with Culvert, Minor Approach Grading and Aggregate Surfacing
Results
$120,189 est. value
MN

Bridge Replacement with Culvert, Approach Grading and Aggregate Surfacing
Renovation, Infrastructure
Bidding
MN

DNR1 Eckvoll WMA Culvert Installation
Post-Bid
Gatzke, MN 56724

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Kingsview Heights Drainage Improvement
Infrastructure
Bidding
Plymouth, Wayzata, MN 55442

Butler Road - Culvert Replacement
Post-Bid
MN

Cranberry WMA - Dike Modifications
Results
Braham, MN

Last Updated 12/01/2021 10:05 AM
Project Title

Farr Lake Danube Pond Dredging

Physical Address View project details and contacts
City, State (County) Fridley, MN 55432   (Anoka County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installing erosion control BMPs; erosion control construction entrances; control of water and/or dewatering to perform work; removal of trees, stumps, and vegetation; together with debris cleaning; general site work with off-site disposal of materials; repair/replace riprap at inlet/outlet structures; mud mat protection on access route; control of traffic at and around construction sites, site restoration; installing erosion control blanket on all exposed soils. Clean-up of sites and removal/disposal of temporary erosion control BMPs at the completion of Work, all as provided for in the Bidding Documents.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents