Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

HSIP - 2022 Statewide Intersection and Crosswalks - North/Central
Infrastructure
Bidding
RI

Construction Services for City Wide 50/50 Sidewalk Program
Post-Bid
Pawtucket, RI

Blackstone River Bikeway
Post-Bid
Central Falls, RI 02863

Sylvian Street Infrastructure and Streetscape Improvements
Results
Central Falls, RI

Sylvian Street Infrastructure and Streetscape Improvements
Results
Central Falls, RI

Galego Court Reclamation and Resurfacing Project
Infrastructure
Bidding
$3,000,000 est. value
Pawtucket, RI 02860

Integrally Colored and Stamepd Concrete Sidewalk/Steps/Patio
Post-Bid
Providence, RI

Infrastructure and Streetscape Improvements to Improve Residents' Access to Commuter Rail Station and Bus Hub
Results
Central Falls, RI

Design/Build Services for Route 146 Reconstruction
Post-Bid
Providence, RI 02912

City Wide Cold Planing
Results
Woonsocket, RI

Tunnel Pump Station Lot Crack Repairs
Post-Bid
Providence, RI 02905

Granite Curbing
Term Contract
Results
Woonsocket, RI

Paving Project
Infrastructure
Post-Bid
Providence, RI

Installation of Portland Concrete Cement Sidewalks
Term Contract
Results
Woonsocket, RI

Last Updated 07/11/2022 11:04 PM
Project Title

Bituminous and Concrete Patching of Sidewalks and Roadways

Physical Address View project details and contacts
City, State (County) Pawtucket, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $80,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pawtucket Water Supply Board (PWSB) for bituminous and concrete patching of sidewalks and roads in the Cities of Pawtucket and Central Falls and the Town of Cumberland, Rhode Island. Roadways and sidewalks will be excavated by PWSB personnel in the course of work related to installation, repair, maintenance, etc. of the PWSB water lines, hydrants, valves, services, and other appurtenances. Such excavations will be backfilled by the PWSB. The needed repairs to the pavement will be the responsibility of the contractor under these specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents