Similar Projects
Truck & Travel Fueling Center
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Joliet, IL 60436

Parkwood Business Park Phase 2
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Romeoville, IL 60446

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Boyer-Rosene
New Construction, Infrastructure - 52,884 SF
Design
$10,000,000 CJ est. value
Romeoville, IL 60446

2023 Renovation Work Edna Keith Elementary School
Renovation
Bidding
$305,000 CJ est. value
Joliet, IL 60433

Joliet Ottawa Water Main Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Joliet, IL 60434

House of Harvest
New Construction, Infrastructure - 3,500 SF
Post-Bid
$934,500 CJ est. value
Plainfield, IL 60544

Crete Monee Elementary School 2022 Renovation Work
Renovation
Post-Bid
Crete, IL 60417

Bathroom Remodeling
Renovation
Results
$100,000 est. value
Beecher, IL 60401

Chaney Monge School Improvements
New Construction
Results
Crest Hill, IL 60403

Robert C. Hill Elementary School Addition and Renovations - Bid Group No. 1 Packages #1 through #2
Addition, Demolition, Renovation, Infrastructure
Construction
$3,095,712 CJ est. value
Romeoville, IL 60446

Robert C. Hill Elementary School Addition and Renovations - Bid Group No. 1 Packages #1 through #2
Addition, Demolition, Renovation, Infrastructure
Construction
$3,095,712 CJ est. value
Romeoville, IL 60446

West 159th Street Townhomes
New Construction, Infrastructure
Pending Verification
$7,500,000 CJ est. value
Homer Glen, IL 60491

Farnsworth Avenue Bridge Phase III - City of Aurora
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Aurora, IL 60503

3501 Industrial-Joliet
New Construction, Infrastructure - 18,000 SF
Conception
$10,000,000 CJ est. value
Joliet, IL 60436

Last Updated 12/02/2022 04:38 AM
Project Title

Robert C. Hill Elementary School Addition and Renovations - Bid Group No. 2

Physical Address View project details and contacts
City, State (County) Romeoville, IL 60446   (Will County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $3,709,600 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Valley View Community Unit School District 365-U Robert C. Hill Elementary School Addition and Renovations 616 Dalhart Avenue Romeoville, IL 60446 Any proposal received after the time and date stated above will be returned to the Bidder unopened. The competency and responsibility of the Bidders will be considered in making awards. GENERAL The project consists of a building addition, selected interior renovations, and associated site work. Such proposals as herein concerned shall be for the following as described: BID GROUP NO. 2 - General Contracting Bid security in the form of a certified check, cashier's check, or bid bond made payable to Valley View Community Unit School District 365-U, in an amount equal to ten percent (10%) of the base bid is required. oAIA Form A305 Contractor Qualifications to be provided with bid. All questions concerning this project or those concerning bidding requirements should be directed to: jpaul@wightco.com Questions must be received in writing, or via email ( jpaul@wightco.com ), until 10:00 a.m. Thursday October 27th, 2022. The Owner reserves the right to accept or reject any and all bids, and to waive informalities to any bid when such is deemed by the Owner to be in the Owner's own best interests. This advertisement is issued in the name of Valley View Community Unit School District 365-U.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents