Similar Projects
Leavitt Reservoir Expansion Project
New Construction, Infrastructure
Results
$40,000,000 to $50,000,000 est. value
Greybull, WY

Statewide Beaver Dam Analog Installation
Renovation
Results
$500,000 est. value
Cheyenne, WY

Basin Eagles - Annex Rehabilitation
Renovation
Post-Bid
$70,000 to $90,000 est. value
Basin, WY

Z--Fubar Detention Dam Decommissioning
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value
Cody, WY

Reported 07/16/2022 12:00 AM
Project Title

JHL Veggie-Rap

Physical Address View project details and contacts
City, State (County) Teton Village, WY   (Teton County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to remove vegetation and rehabilitate the revetment of the Jackson Project Levees, as well as perform short notice repairs of levee sites damaged by spring river flows. The project is in Teton County, Wyoming, near the town of Jackson. The project consists of 28 levees (33 miles total), 48 levee access roads, and 5 riprap stockpile sites. The contractor selected to perform this work will be required to perform work to include: Remove and dispose of vegetation located on project levees, sized from brush to trees more than 20” in diameter, in a legal manner. Load and transport government furnished riprap and/or fill material to worksites from Project Stockpiles. Rock weighs up to 3000 pounds. Temporarily remove existing revetment to enable re-grading of slopes of levee to a specified profile. Excavate for a toe trench to replace/reconstruct the levee toe. This work will occur in-water for approximately 50% of the levee length, on average. Place levee fill material in lifts. Compact levee fill to specification standards with compaction equipment. Mix new riprap with old material, placing rock individually on levee profile and toe to ensure rock is properly keyed. Some of the work will be performed in the water by excavators. In these locations where the river is immediately adjacent to the levee, only the bucket of the excavator will enter the water. Waters of this region of the Snake River routinely exceed 10 feet/second in velocity.

Details

Dam/Tunnel, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents