Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

First Ave West Pavement Rehabilitation and Traffic Signals
Bidding
$2,470,000 est. value
Cedar Rapids, IA 52407

2022 Excelsior Middle School Parking Lot
Infrastructure
Bidding
Marion, IA 52302

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

FY 2022 Pavement Patching
Results
$1,400,000 est. value
Cedar Rapids, IA

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

PCC Sidewalk/Trail
Infrastructure
Bidding
Marion, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

PCC Patching
Infrastructure
Bidding

Trail Ridge Road South East from Southern Indiandale Road to Red Fox Road
Results
$1,510,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Last Updated 01/28/2022 07:56 AM
Project Title

8th Avenue South West from 15th Street South West to Rockford Road

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52407   (Linn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,220,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

2 PCC Reconstruction, Storm Sewer, Sidewalk, and Basin.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents