Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

A-E Architectural Design Services at Various Installations
Post-Bid
Less than $99,000,000 est. value

Facilities Planning and Industrial Engineering A/E Contract
Results

Mississippi River Headwaters Watershed Bank Service Area
Results

Conference Site Study & Design RFP
Renovation
Pending Verification
Hastings, MN 55033

Sustainability Consultant Services
Alteration
Bidding
Burnsville, MN

Engineering, Planning and Development
Post-Bid

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

Public Works Energy A-E Services - Worldwide
Renovation
Bidding
$40,000 to $3,000,000 est. value

Burnsville Bus Garage (BBG) Modernization Owner's Representation
Post-Bid
Burnsville, MN 55337

Architectural and Engineering Services - South Saint Paul Library
New Construction
Results
South Saint Paul, MN 55075

Rahn Park Building Remodel and Addition
Renovation, Addition, Infrastructure - 3,650 SF
Bidding
Eagan, MN 55122

Last Updated 01/11/2022 04:29 PM
Project Title

Treetop Trail Owner's Rep Services

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Animal/Plant/Fish Facility, Entertainment/Recreation, Professional Services
Sub-Category(s) Animal/Plant/Fish Facility, Engineering, Misc. Recreational, Theme Park
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Greater than $50,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Treetop Trail, a major project to repurpose an existing 1.25-mile monorail track loop into an accessible walking platform through the tree canopy. The Owner’s Representative will work closely with Zoo leadership and various stakeholders during design finalization and throughout construction to ensure all stakeholder needs are met and the Zoo’s tradition of excellence is maintained.

Details

Misc. Recreational, Renovation, Theme Park, Renovation, Animal/Plant/Fish Facility, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents