Similar Projects
Bugbee Senior Center Heat Pump Systems Phase 2
Bidding
Hartford, VT 05001

Renovations of HVAC in Dormitory Buildings
Post-Bid
$1,000,000 to $5,000,000 est. value
Vergennes, VT 05491

Mini-Split AC/Heat Pump, Ball Mountain Lake, Jamaica, VT and Townshend Lake, Townshend, VT
Post-Bid
$15,000 to $25,000 est. value
Jamaica, Townshend, VT 05353

Town Shed Chimney Replacement
Results
Barton, VT 05822

Municipal Building HVAC Retrofit Phase 1
Term Contract
Results
Barre, VT

Heating Contractors - Weatherization Program Services
Term Contract
Post-Bid
Bennington, Rutland, VT

Unit Vent Replacement - Rutland Town School
Results
Rutland, VT 05701

Weatherization Program Services - Heating Contractors
Post-Bid
Addison, Chittenden, Franklin, Grand Isle, VT

Wastewater Treatment Facility Digester Boiler Replacement
Results
Barre, VT 05641

Heating Contractors for Weatherization Assistance Program
Post-Bid

Town Buildings HVAC
Term Contract
Results
Colchester, VT

Wright Hall Chiller Replacement
Post-Bid
Burlington, VT 05401

Police Department Ventilation System
Results
White River Junction, VT 05001

2020 Pellet Boiler Miller’s Run Elementary School
Post-Bid
Sheffield, VT 05866

Hinesburg Community School Kitchen Ventilation Upgrade
Results
Hinesburg, VT 05461

Last Updated 11/16/2020 10:58 AM
Project Title

Inline Fan Install, Saint Albans Federal Building, Saint Albans, Vt

Physical Address View project details and contacts
City, State (County) Saint Albans, VT 05478   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves modification of the existing Supply ductwork to install (3) new Zone booster fans. USPO and Custom House The project addresses low static pressure concerns for three zones. Work Includes: Modifying supply zones to fit in (3) new booster fans supplied by the contractor. Contractor is responsible for re-insulating the duct work affected by the modification and all new ductwork to match existing. Environment firm to clean any dust in the three zones modified for the inline fan install and test for lead to ensure its below 40 micrograms per sqft. Insulate once tested and cleaned per SOW. Commission three new inline fans.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents