Similar Projects
Waste Removal
Infrastructure
Bidding
Claymont, Newark, Wilmington, DE - Newcastle, ME 19804

Snow Removal and Sanding Contract 2020-2021
Term Contract
Post-Bid
Stow, ME 04058

Snow Removal
Term Contract
Post-Bid
Mars Hill, ME

Beach Barrel Waste Collection Service
Term Contract
Results
Wells, ME

Solid Waste Removal - Scrap Metal
Results
Lewiston, ME

Snow Removal Services
Term Contract
Post-Bid
Brunswick, ME

Rubbish and Recycling Pickup Services at Portland International Jetport
Results
Portland, ME

Snow Removal and Sanding Services at Wood Elementary School/Central Office Area
Term Contract
Post-Bid
Oakland, ME

2020-2022 Snow Removal and Winter Road Maintenance Contract
Term Contract
Results
Pittston, ME 04345

Snow Removal and Sanding Services at Messalonskee High School/Messalonskee Middle School/Williams Elementary School Area
Term Contract
Post-Bid
Oakland, ME

Plowing and Removal of Snow at Portland International Jetport
Results
Less than $550,000 est. value
Portland, ME 04102

Snow Removal and Sanding Services at Transportation/Maintenance/Biomass Plant Area
Term Contract
Post-Bid
Oakland, ME

Snow Plowing and Ice Control
Results
Dresden, Richmond, ME 04342

Transport, Marketing and Disposal of Waste Materials
Post-Bid
Standish, ME 04084

Snow Plowing and Ice Control
Results
Bowdoin, Litchfield, Richmond, Sabattus, ME 04357

Reported 11/18/2021 12:00 AM
Project Title

Road Maintenance Snow Removal Summer Maintenance

Physical Address View project details and contacts
City, State (County) ME   (Somerset County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall commence plowing and sanding or salting when the snow on the road surface has reached a depth of no more than one (1”) inch. Snow removal and sanding operations shall continue until roadways are cleared of snow to the outside shoulders. A Sand / Salt mixture shall be spread to cover the center two thirds (2/3) of the roadway at a spread rate of no more than 1500 lbs (1/2 cubic yard) per center line mile. Careful attention shall be given to the melting action so as to remove any and all slush (30% melted snow pack or ice) as soon as possible.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents