Similar Projects
Empire - AML Reclamation Project
Bidding
Irondale, AL

Recreation Center Drainage and Tennis Center Court Improvements
Bidding
Orange Beach, AL 36561

District 4 Water/Sewer Improvements (Fleming Road Drainage Improvements)
Post-Bid
$700,000 to $750,000 est. value
Montgomery, AL

Corrugated Steel Pipe
Term Contract
Post-Bid
Huntsville, AL

Gulley Repair on County Road 8 South of Tumbleton
Results
$85,000 to $115,000 est. value
AL

Storm Drainage Improvements
Results
Less than $200,000 est. value
Elberta, AL

Drainage Improvements on Fernwood Drive West
Bidding
Bay Minette, AL 36507

Lagoon Closure at Searcy Hospital
Post-Bid
Less than $425,000 est. value
Mount Vernon, AL

Erosion Control and Stabilization of Rock Creek
Results
Fairhope, AL

Chelsea Business Park-No 1 Grading and Storm Drainage
Bidding
Chelsea, AL

Gibbs Village East and West Erosion Control/Sidewalk Improvements
Post-Bid
Montgomery, AL

2724 16th Avenue North Drainage Improvements
Results
Birmingham, AL

Concrete Pipe, Inlet Boxes, Storm Pipe, IB Pipe, PVC Inlets and Ductile Iron Pipe
Bidding
Huntsville, AL

2018 CIP City Wide Miscellaneous Drainage Repairs - Group B
Post-Bid
Mobile, AL

Stormwater Drainage Improvements
Results
Less than $167,265 est. value
Taylor, AL

Reported 01/09/2019 12:00 AM
Project Title

Mooreland Road Stabilization Project

Physical Address View project details and contacts
City, State (County) Montgomery, AL   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000 to $120,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The scope of work involves installing a new cul-de-sac including removing existing pavement, inlets and storm pipe. New work will include new base, paving, curb and gutter, driveways, signage and inlets. The Additive Alternate work will consist of sod and trees on adjacent lot. A bracket of cost for this project is $100,000 to $120,000. The bracket range is shown only to provide general financial information and should not be used in preparing a bid.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents