Similar Projects
Cheechunk Road Mixed Use
New Construction - 34,160 SF
Conception
$40,000,000 est. value
Goshen, NY 10924

Great Wolf Lodge & Waterpark Resort
New Construction
Conception
Chester, NY 10918

Holiday Inn Express
New Construction - 137,797 SF
Design
New Windsor, NY 12553

Goshen Plaza
New Construction - 104,600 SF
Design
$10,000,000 CJ est. value
Goshen, NY 10924

Thayer Flats Hotel Resort & Spa at West Point
New Construction - 157,000 SF
Sub-Bidding
$39,083,844 est. value
Highland Falls, NY 10928

Thayer Flats Hotel Resort & Spa at West Point
New Construction - 157,000 SF
Sub-Bidding
$39,083,844 est. value
Highland Falls, NY 10928

Legoland Hotel
New Construction - 167,732 SF
Post-Bid
$10,000,000 CJ est. value
Goshen, NY 10924

Sources Sought Market Survey for Construction of CEAC/Parking Structure, West Point, NY
New Construction - 136,000 SF
Post-Bid
$100,000,000 to $250,000,000 est. value
West Point, NY

Residence Inn
New Construction - 87,000 SF
Construction
$19,000,000 est. value
Middletown, NY 10941

The Front Hotel
New Construction
Pending Verification
Port Jervis, NY 12771

Holiday Inn Express & Suites
Renovation
Pending Verification
$700,000 est. value
Montgomery, NY 12549

Pulpit Rock Inn
New Construction - 34,685 SF
Conception
Warwick, NY 10990

William Street Hub Shopping Center
Addition
Design
Newburgh, NY 12550

Project Labor Agreement (PLA) Market Research for Construction of CEAC/Parking Structure, West Point, NY
New Construction - 136,000 SF
Post-Bid
$100,000,000 to $250,000,000 est. value
West Point, NY

Hotels, Service Station & Restaurant
New Construction
Pending Verification
Goshen, NY 10924

Reported 06/27/2019 09:20 AM
Project Title

Woodbury Commons Premium Outlets Phase 5

Physical Address View project details and contacts
City, State (County) Central Valley, NY 10917   (Orange County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage, Shopping Center/Strip Mall
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected July 2020, Construction Completion Expected December 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construct 143, 492 SF retail, construct new five-level parking structure, expand existing four-level parking structure, construct two 120-room hotels, construct 14,000 SF outlot pads, 12,000 SF restaurant space, 6,000 SF spa facility adjacent to hotels, construct 10,000 SF storage within parking structures.
Details Shopping Center/Strip Mall, 1 Story Above Grade, 143,492 SF New Construction, Parking Garage, 5 Stories Above Grade, New Construction, 2 Hotel/Motel, New Construction 120 Unit(s).
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents