Similar Projects
Lot X
New Construction - 588,000 SF
Conception
$153,000,000 est. value
Sacramento, CA 95814

Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Phan Apartment Homes At Sierra Vista Park
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Sacramento, CA 95823

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

Broadway Complete Street Project
Infrastructure
Bidding
$15,600,000 CJ est. value
Sacramento, CA 95814

Fern Bacon Middle School Safe Routes to School (SRTS) - 574 - County of Sacramento
Infrastructure
Bidding
$500,000 CJ est. value
Sacramento, CA 95823

RFQ Engineering - Design Services for Merced to Madera
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Sacramento, CA 95814

Community Garden at Floyd Farms
Renovation
Post-Bid
Sacramento, CA 95818

Meadows Park Phase 2
Renovation
Results
$406,054 est. value
Sacramento, CA 95814

On-Call Drilling and Well Installation Services for City Landfills
Term Contract, Alteration
Results
Sacramento, CA

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Shops at Folsom Ranch
New Construction, Infrastructure - 27,900 SF
Construction
$9,000,000 CJ est. value
Folsom, CA 95630

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Folsom Plan Area Fire Station #34 - City of Folsom
New Construction, Infrastructure
Conception
$10,800,000 CJ est. value
Folsom, CA 95630

Last Updated 04/12/2023 07:33 AM
Project Title

Mira Loma High School Tennis Court Replacement

Physical Address View project details and contacts
City, State (County) Sacramento, CA 95821   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $990,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project is a public works project within the requirements of Division 2, Part 7, Chapter 1 of the California Labor Code, and that each bidder and listed subcontractor is required to be registered pursuant to Labor Code section 1725.5 at the time of biding. Failure of the bidder to be registered at the time of bidding shall render the bid non-responsive and unavailable for award. Bidder's listing of an unregistered subcontractor may render the bid non-responsive and unavailable for award unless such failure is the result of an inadvertent error and the provisions of Labor Code section 177.1 apply. License Required: B - General Building Contractor Scope of Work including but not limited to: Removal and replacement of tennis court paving, to include asphalt, surfacing and striping and perimeter fencing and gates at Casa Roble High School. Removal and replacement of tennis court paving, surfacing, and striping; removal and replacement of existing hardcourt; and accessibility upgrades to parking and student drop-off zone in existing parking lot at Mira Loma High School. Failure to include the certification will render the bid non-responsive. For all Pre-Bid visits (other than the Pre-bid conference), Bidder must make an appointment with the school prior to visiting the Site. Overall coordination of the Project will be the responsibility of the District Representative. All inquiries regarding the bid are to be directed to Maria Mahon, Procurement Specialist - maria.mahon@sanjuan.edu, Facilities Business Department - facilitiesbusiness@sanjuan.edu, and cc: Patty Pimentel, Vanir - District representative, patty.pimentel@vanir.com. Contracts for construction will be direct prime contracts with the District. All Project procedures and documents are designed to facilitate delivery of the Project through prime construction contracts. The District's forms shall be used for all documents. Bidders shall read and review the Bidding Documents carefully and shall familiarize themselves thoroughly with all requirements. Each bid proposal shall conform to the requirements of the Contract Documents. Bid documents are available to be downloaded from the District No bid will be considered unless it is accompanied by Cashier's Check, Certified Check or Bid Bond from a surety authorized to do business in California for ten percent (10%) of the total amount of the bid, including additive Alternate Bids, made payable to the District. The above-mentioned check or bid bond shall be given as a guarantee that the Bidder shall, if selected by the District, execute the Contract, in conformance with the Contract Documents. For more information, refer to Section 00 21 13, Article 1, Section 1.06. Bids shall not expire for a period of ninety (90) days after the date set for the bid opening. Within ten (10) days after notification of the District's Notice of Intent to Award the Contract, the successful Bidder will be required to furnish a Labor and Material Bond and a Faithful Performance Bond. For further information, refer to Sections 00 61 13.13 and 00 61 13.16. The District is an equal opportunity employer. Refer to General Conditions Section 00 72 00, Article 7, Section 7.09. The District encourages the participation of DVBE businesses. Refer to Special Provisions Section 00 73 00. The successful Bidder shall be required to pay its workers on this Project a sum not less than the general prevailing rate (applicable at time of bid advertisement date) of per diem wages and not less than the general prevailing rate for holiday and overtime work for work of a similar character in the locality in which the Project is performed, as provided under California Labor Code Sections 1726-1861. Copies of the prevailing rate of per diem wages may be obtained on the portal. Refer to General Conditions Section 00 72 00, Article 7. The Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No bid will be considered unless it is accompanied by Cashier's Check, Certified Check or Bid Bond from a surety authorized to do business in California for ten percent (10%) of the total amount of the bid, including additive Alternate Bids, made payable to the District. The above-mentioned check or bid bond shall be given as a guarantee that the Bidder shall, if selected by the District, execute the Contract, in conformance with the Contract Documents. For more information, refer to Section 00 21 13, Article 1, Section 1.06. Bids shall not expire for a period of ninety (90) days after the date set for the bid opening. Within ten (10) days after notification of the District's Notice of Intent to Award the Contract, the successful Bidder will be required to furnish a Labor and Material Bond and a Faithful Performance Bond. For further information, refer to Sections 00 61 13.13 and 00 61 13.16. The District is an equal opportunity employer. Refer to General Conditions Section 00 72 00, Article 7, Section 7.09. The District encourages the participation of DVBE businesses. Refer to Special Provisions Section 00 73 00. The successful Bidder shall be required to pay its workers on this Project a sum not less than the general prevailing rate (applicable at time of bid advertisement date) of per diem wages and not less than the general prevailing rate for holiday and overtime work for work of a similar character in the locality in which the Project is performed, as provided under California Labor Code Sections 1726-1861. Copies of the prevailing rate of per diem wages may be obtained on the portal. Refer to General Conditions Section 00 72 00, Article 7. The Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The governing board of the District reserves the right to reject any and all proposals and to waive any irregularity in any proposals received. At the request and expense of the successful Bidder, eligible securities shall be accepted in lieu of retention payments to insure performance under the Contract, pursuant to California Public Contract Code Section 22300. Refer to Exhibit H and General Conditions Section 00 72 00, Article 12, Section 12.05. Said securities shall be deposited prior to the submission of the successful Bidder's first progress payment application. The District participates in all available rebate programs. The successful Bidder agrees to notify the District of any available rebate of which the successful Bidder is aware, and to provide the District with invoices and all other documentation necessary to claim any available rebate. The District will apply for available rebates, and the rebates will be paid directly to the District, not the successful Bidder. The successful Bidder shall have at least one supervising technician on call in the event that the existing fire alarm, security clocks, intercom, telephone and data systems are damaged during the course of construction or the Contract requires relocation of existing devices. The supervising technician is required to be on Site during all aspects of repair, modifications and testing. For fire alarm modifications and repairs the supervising technician is required to have at a minimum NICET LEVEL 2 Certification or equal. The District may consider optional Underwriters Laboratories Certification, factory training or contractor demonstrated equal experience/training with prior approval. The supervising technician must also have a minimum 5-years installation experience. PN - I419

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents