Similar Projects
2020 Well 6 Rehabilitation
Bidding
Mount Pleasant, MI

Primary Effluent Pump #2 Replacement
Bidding
Jackson, MI

Repair/Replacement of 11 Well Pump Assemblies
Post-Bid
Grayling, MI

Wemco Muniflo Pump Parts
Post-Bid
Pontiac, MI

150,000 Gallon Elevated Tank and Well Pump Improvement
Results
Less than $1,092,861 est. value
Union City, MI

2018 Influent Pump Replacements
Results
Saginaw, MI

Peristaltic Chemical Metering Pumps
Post-Bid
Cadillac, MI

One (1) ARO Grease Pump Model LP3009-1 or Approved Equivalent
Results
Less than $875 est. value
Mount Clemens, MI

Trash Pump
Post-Bid
Pontiac, MI

Tap Oden Fish Hatchery- Discharge UV Sterilization
Results
Alanson, MI

New Municipal Water Well
Post-Bid
Mackinaw City, MI

Portage Lake Water and Sewer Authority - Influent Screw Pump Improvements
Results
Less than $523,000 est. value
Houghton, MI

Wastewater Treatment Plant Screw Pump Wet Well Improvements
Post-Bid
Big Rapids, MI

Pump Repairs Services & Check Valve Replacements At The Water Treatment Plant
Results
Traverse City, MI

Two (2) Submersible Sewage Pumps
Post-Bid
Cadillac, MI

Last Updated 02/28/2019 09:21 AM
Project Title

DNR Baraga State Park - Electrical and Wet Well Upgrades

Physical Address View project details and contacts
City, State (County) Baraga, MI   (Baraga County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of the current electrical power pedestals, directional boring of electrical, feeder wiring, two electrical power site services, along with camping pad upgrades, road reconstruction with asphalt, site full hookups with water and sanitary, water service main replacement and upgrading the sanitary wet well manholes and controls.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents