Similar Projects
AutoZone #5334 / East Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

AutoZone #5334 / East Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

RFP D/B - Park and Recreation Building Project
New Construction, Infrastructure - 5,000 SF
Bidding
$4,500,000 CJ est. value
East Norriton, PA 19401

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Parking Lot Repairs and Paving at Fort Washington, Jarrettown & Thomas Fitzwater Elementary School
Results
Dresher, Willow Grove, PA 19034

Paving Project
Results
Willow Grove, PA 19090

Ursinus College Main Street Pedestrian Improvements
New Construction
Construction
$930,000 est. value
Collegeville, PA 19426

RFQ Engineering - Sundstrom Field Baseball Facility Restoration
Infrastructure
Pending Verification
$400,000 CJ est. value
Pottstown, PA 19464

North Narberth Avenue O/AMTRAK
New Construction, Infrastructure
Design
Narberth, PA 19072

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Construct New Parking Lot - Penn Wynne Elementary School
Results
$350,000 to $450,000 est. value
Wynnewood, PA 19096

23 Moore to Geerdes
Infrastructure
Design
King of Prussia, PA 19487

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Ridge Pike Improvement Project - Section D
Term Contract
Results
Norristown, PA

Last Updated 09/13/2022 12:40 AM
Project Title

2022 Roadway Improvement Program

Physical Address View project details and contacts
City, State (County) Worcester Township, PA 19426   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,129,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Base Contract will generally include the overlay of nine (9) Township Roadways (43,996 SY/4,175 TON). The Base Contract work along Township roadways will also include 183 LF of concrete curb replacement, 2 EA Type C inlet top replacements, 41 EA sanitary sewer manhole grade adjustments, 1,843 SY of pavement repair, 7,227 LF of curbline/intersection/driveway milling and 676 TON leveling/scratch course. The Base Contract work at Heebner Park will generally include 50 LF of curbline/intersection/driveway milling, 45 TON of leveling/scratch course (parking area), 400 TON wearing course (parking area), 1 EA traffic calming device (parking area - complete in place), the placement of pavement markings in the parking area and 5,560 SY of paved trail (505 TON). The Base Contract work at Mount Kirk Park will generally include 75 LF of curbline/intersection/driveway milling, 325 TON base course (parking area), 204 TON wearing course (parking area), 1 EA traffic calming device (parking area - complete in place), parking area pavement markings and 840 SY of paved trail (75 TON). The Base Contract work at Zacharias Trail will generally include 140 SY of paved trail (15 TON). Alternate/Add-On No. 1 will generally include the full-width mill and overlay of Cedar Hill Road (3,856 SY/350 TON). The work will also include the replacement of 1 EA Type C inlet top, 60 TON of leveling/scratch course and the replacement of 1 EA 2' x 10' stop bar. Alternate/Add-On No. 2 will generally include the overlay of Hedwig Lane (680 TON). The work will also include 25 LF of concrete curb replacements, 7 EA Type C inlet top replacements, 50 SY of pavement repair, 4,298 LF of curbline/intersection/driveway milling and 100 TON of leveling/scratch course. Alternate/Add-On No. 3 will generally include the overlay of Broadview Lane. The work will also include 407 LF of curbline/intersection/driveway milling and 20 TON of leveling/scratch course Attachment #1 of PennDOT Proposal and Contract MS-944 (Pages 3A-1 to 3A-3), as well as the "Summary of Estimated Quantities" (Pages 3B-1 to 3B-4), contained in the Proposal and Contract Section of the Contract Documents, provides the quantities for each roadway. The "Instructions to Bidders" section describes the bidding requirements under this Contract. All work and materials shall be in accordance with PennDOT Standards and Specifications. All bidders on this project must be pre-qualified by the Pennsylvania Department of Transportation in accordance with Section 102.01 of PennDOT Specifications Publication 408, latest edition. This project is subject to the terms and conditions of the Pennsylvania Prevailing Wage Act, as determined by the Secretary of Labor and Industry and, therefore, must be bid as such. The project is subject to the terms of the Public Works Employment Verification Act (Act 127 of 2012). Completed and signed "Public Works Employment Verification Form" is required as a precondition to the award of the Contract and is to be submitted as part of the submission of bid. Clarification Deadline:5/4/2022 4:00 PM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents