Similar Projects
HMA Overlay, Preventive Maintenance - US 6
Infrastructure
Design
$3,692,434 CJ est. value
Bremen, IN 46506

Bridge Thin Deck Overlay - US 31
Infrastructure
Bidding
$330,725 CJ est. value
Plymouth, IN 46563

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Jefferson High School 2022 Site Package
Infrastructure
Post-Bid
Tippecanoe, IN

Plymouth Phase 2 Taxiway Pavement
Infrastructure
Results
$2,464,017 CJ est. value
Plymouth, IN 46563

Culver Elementary School 2023 Renovations and Building System Improvements
New Construction, Infrastructure - 57,042 SF
Results
$2,489,000 CJ est. value
Culver, IN 46511

Community Crossing 2022-1
Infrastructure
Post-Bid
$580,000 CJ est. value
Plymouth, IN 46563

Water System Improvements
New Construction, Infrastructure
Results
$3,278,872 CJ est. value
Bourbon, IN 46504

Plymouth Municipal Airport Improvement Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Plymouth, IN 46563

2022 North Center / Dewey Street Storm Improvements
Infrastructure
Post-Bid
$70,000 CJ est. value
Bremen, IN 46506

Community Crossings Project
Infrastructure
Post-Bid
$795,000 CJ est. value
Bourbon, IN 46504

Lake Shore Drive Widening from State Road 10 to Academy Drive
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Culver, IN 46511

2022 Community Crossings Road Improvement Call 2
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Argos, IN 46501

Argos Parking Lot & Site Improvements
Infrastructure
Post-Bid
$500,000 CJ est. value
Argos, IN 46501

Last Updated 04/27/2023 12:40 PM
Project Title

Academy Road Water Main Extension

Physical Address View project details and contacts
City, State (County) Culver, IN 46511   (Marshall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $198,127 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the construction of approximately 1,600 lineal feet of 6-inch water main, fittings, fire hydrants and appurtenances. Water main to be installed by horizontal directional drilling. The bidder must file with their sealed bid a certified check or a bid bond in the amount not less than five percent (5%) of the total amount of the highest aggregate proposal, payable to the Owner. The above check or bond is to insure the execution of the contract on which such bids are made Bids shall be properly and completely executed on proposal forms included in the Specifications. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Specifications. Under Section III of Form 96, the Bidder shall submit a financial statement. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. A conditional or qualified Bid will not be accepted. All applicable laws, ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the project throughout. The work to be performed and the bid to be submitted shall include sufficient and proper sums for all general construction, mechanical installation, labor, materials, permits, licenses, insurance, and so forth incidental to and required for the construction of the facilities. The Owner reserves the right to reject any and all bids and to waive any formalities. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) days. Award will be made to the low, responsive, responsible bidder. The contractor(s) to whom the work is awarded will be required to furnish, before commencing work, a performance and payment bond in an amount equal to the bid price of the contract awarded to said contractor and certification of all insurance required in the specifications. All bonds and liability insurance shall remain in effect for the period listed in the specifications following completion and acceptance of local and federal agencies.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents