Similar Projects
Last Updated | 06/05/2023 07:34 PM |
Project Title | Garrard Creek Road Realignment |
Physical Address | View project details and contacts |
City, State (County) | Oakville, WA 98568 (Grays Harbor County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,850,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | M.P. 3.1 to M.P. 3.6 The work to be performed under this contract consists of realigning the existing Garrard Creek Road between mile markers 3.1 and 3.6. Bid items include Mobilization, Lump Sum; Clearing and Grubbing, Lump Sum; Roadway Excavation Incl. Haul, 4,950 C.Y.; Gravel Borrow Incl. Haul, 10,700 Ton; Embankment Compaction, 5,800 C.Y.; Streambed Sediment, 340 Ton: Light Loose Riprap, 610 Ton; Streambed Cobbles 6 in., 105 Ton: Cl. V Reinf. Conc. Culv. Pipe 18 In. Diam., 147 L.F.; St. Str. Plate Culvert 16 Ft. Span 7 Ft. Rise, 60 LF: St. Str. Plate Culvert 12 Ft. Span 6 Ft. Rise, 68 LF: Crushed Surfacing Base Course, 7,940 Ton; HMA Cl. 1/2 In. PG 64-22, 1,910 Ton; Seeding, Fertilizing, and Mulching (Approx. 1.8 Acres), Lump Sum; PSIPE - Shrub, 1 Gal., 506 Each; PSIPE - Shrub, 2 Gal., 511 Each; PSIPE- Shrub, 5 Gal., 103 Each: PSIPE- Tree, 5 Gal., 348 Each; Soil Amendment, 3,900 S.Y.; Temporary Stream Diversion-Stream 1, Lump Sum; Temporary Stream Diversion-Stream 1, Lump Sum; Project Temporary Traffic Control, Lump Sum; and other related work. Est. Completion Date: Nov. 30, 2023 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |