Similar Projects
Taxiway C and Shoulders Rehabilitation
Infrastructure
Bidding
$2,300,000 est. value
Burbank, CA 91505

La Mesa Junior High School 2 Shade Structures and Outdoor Lighting Project
Term Contract
Bidding
Santa Clarita, CA 91351

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Post-Bid
Los Angeles, CA 90081

2001 North Garey Avenue Power Upgrade
Infrastructure
Post-Bid
Walnut, CA 91789

New 400-Amp Panel for Future Electric Vehicle Charging Stations, and Concrete Pad for Edison's Surface Mounted Transformer & Required Conduits
Alteration
Results
Torrance, CA 90504

Low Voltage and Network Cabling
Alteration
Results
Torrance, CA 90503

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Electric Service Upgrade at Five School Sites
Renovation, Infrastructure
Post-Bid
Whittier, CA 90603

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Led Lighting Retrofit
Alteration
Post-Bid
Los Angeles, CA 90007

Electrical System Repair Services
Alteration
Results
CA

Electric Vehicle Charging Station Solutions
Infrastructure
Post-Bid
Carson, CA 90745

Electrical System Repair Services
Alteration
Results
CA

Campus Electrical Infrastructure Upgrade
Alteration
Post-Bid
Carson, CA 90747

Reported 03/21/2022 10:00 AM
Project Title

Rehabilitate Runway 12-30 Lighting at Long Beach Airport

Physical Address View project details and contacts
City, State (County) Long Beach, CA 90808   (Los Angeles County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

cope of Services The Work to be done consists primarily of replacement of existing runway lighting circuits (Edge, Centerline lights, PAPI and Touch Down Zone) and constant current regulators, all cables, runway lighting fixtures and transformers, touchdown zone base cans, airfield electrical vault work, ALCMS and other electrical components on Runway 12-30. Work also includes installing pavement markings and striping, Asphalt Concrete paving, and AC grinding. Bids are required for the entire Work.

Details

Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents