Last Updated | 04/15/2022 10:08 AM |
Project Title | Project P-1238 Construction of Grid Stability & Resiliency 10 Mw Battery Energy Storage, Various Buildings |
Physical Address | View project details and contacts |
City, State (County) | Twentynine Palms, CA 92277 (San Bernardino County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | $10,364,940 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Firm-Fixed Price (FFP) Design-Build Construction Contract which will install 10 MW of Battery Energy Storage Systems (BESSs) at various locations on MCAGCC. The work to be acquired under this solicitation is for the Design-Build Construction Contract to install 10 MW of battery energy storage systems (BESSs) that will enhance energy security at various locations at Marine Corps Air Ground Combat Center (MCAGCC) in Twentynine Palms, California. The BESSs shall be capable of powering numerous mission critical and support facilities at the distribution level during a utility grid outage. There are approximately 54 BESSs (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) that will be standalone modular packaged units connected to one or more solar photovoltaic (PV) arrays. The BESSs will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESSs will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESSs into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESSs capable of parallel operation, each located in proximity to existing PV systems. The North American Industry Classification System (NAICS) code is 237130 (Power and Communication Line and Related Structures Construction), and the annual size standard is $39.5 million. |
||||||||||||||||||||||||||||||||||
Details | Warehouse/Storage, New Construction.
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |