Similar Projects
Columbia Children's Arboretum Improvement Project
Alteration
Post-Bid
Portland, OR

Covered areas, Concrete Slabs, and Sidewalks
Infrastructure, Alteration
Post-Bid
$2,000,000 est. value
Brookings, OR 97415

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Concrete Installation Services
Alteration
Results
$150,000 est. value
Hillsboro, OR

Concrete Installation, Repair and Maintenance Services
Alteration
Post-Bid
Salem, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

MPCO(Multi-layer Polymer Concrete Overlay) Epoxy for Salem Bridge Crew
Alteration
Post-Bid
Salem, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Concrete Pad replacement and Concrete Sidewalk and Pad
Infrastructure, Alteration
Results
$300,000 est. value
Culver, OR

Office Remodel - Oregon Department of Transportation District 11 Office
Build-out
Post-Bid
$350,000 CJ est. value
Klamath Falls, OR 97603

2022 City Wide Voluntary Sidewalk and Concrete Repair Projects
Infrastructure, Alteration
Results
$100,000 est. value
La Grande, OR

RFP D/B - North Park Blocks Extension
Addition, Demolition, Infrastructure
Post-Bid
$4,900,000 CJ est. value
Portland, OR 97204

SW 4th Avenue Improvement Project
Infrastructure
Results
$1,515,040 CJ est. value
Portland, OR 97239

RFP Construction Manager - Reedsport Community Charter School Seismic Retrofit
Renovation
Post-Bid
$1,782,300 CJ est. value
Reedsport, OR 97467

Last Updated 06/14/2023 05:32 AM
Project Title

Riverfront Street Design

Physical Address View project details and contacts
City, State (County) Deschutes, OR 97701   (Deschutes County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Bend requests proposals for the Riverfront Street Design project. The purpose of the overall project is to (1) provide the missing link of the Deschutes River Trail between Miller's Landing Park and Drake Park; (2) rebuild Riverfront Street due to its failing pavement conditions; and (3) upgrade and/or relocate existing utilities as necessary. This proposal request is for the project design that will require pre-survey work; a traffic control strategy; erosion and sediment control plans; public outreach; and design of road reconstruction, ADA ramps, water main replacement, water meter box and service relocations, stormwater pre-treatment facilities, and possible utility pole modifications/relocations. Please contact the Issuing Officer no later than two (2) business days prior to Proposal due date to make arrangements ahead of time for an in-person submission. Hard copies will not be accepted unless the Proposer has made arrangements ahead of time. If a hard copy of the Proposal is submitted without prior coordination with the Issuing Officer, the Proposal will be returned (unopened) to the Proposer without consideration. No faxed or emailed submissions will be accepted. In order to download and respond to posted solicitations, Proposer will need to register as a vendor by visiting: (link). Once registered, follow the instructions to download the documents: 1) Log in to the Portal, 2) Under Action column of "Open Public Opportunities page, click on View Opportunity next to Project, 3) Scroll down to Supporting Documentation section to download documents. Proposers are responsible for checking the Portal for the issuance of any addenda prior to submitting a proposal. Proposal results are available via the Bonfire Portal. The City of Bend reserves the right to: 1) modify, revise or withdraw this request for proposal, 2) reject any or all proposal not in compliance with public solicitation procedures and requirements, 3) select consultant on the basis of the proposals or to conduct interviews with the highest qualified proposers after scoring, 4) seek clarifications of any or all proposals, and 5) to select the proposal which appears to be in the best interest of the City. The Riverfront Street project should have 100% construction-ready design documents completed by end of 2024. Construction may happen as early as spring 2025 depending on available funding. The project budget for design and construction is roughly three million dollars, but this may vary depending on final design. Any questions including technical questions must be directed to the Issuing Officer and are encouraged to be submitted via the Portal by clicking on the Messages, Vendor Discussions tab of the desired solicitation. The Citys written response to Questions and/or Requests for Clarification will be posted on the Portal

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents