Similar Projects
Gooch Street Mixed-Use Development
New Construction, Build-out, Infrastructure - 16,870 SF
Conception
$7,000,000 CJ est. value
Biddeford, ME 04005

New Park and Ride Facility - City of Sanford
Infrastructure, Renovation
Conception
$1,596,000 CJ est. value
Sanford, ME 04073

1 Diamond Mixed-Use
New Construction, Infrastructure - 84,000 SF
Design
$129,000,000 CJ est. value
Biddeford, ME 04005

1 Diamond Mixed-Use
New Construction, Infrastructure - 84,000 SF
Design
$129,000,000 CJ est. value
Biddeford, ME 04005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - Memorial Field Playgrounds
Infrastructure
Bidding
$100,000 CJ est. value
Berwick, ME 03901

Hidden Hills Manufactured Housing Park / Phase 1
Infrastructure
Sub-Bidding
$1,250,000 CJ est. value
Biddeford, ME 04005

Hidden Hills Manufactured Housing Park / Phase 1
Infrastructure
Sub-Bidding
$1,250,000 CJ est. value
Biddeford, ME 04005

Crack Sealing
Infrastructure
Post-Bid
Dayton, ME 04005

Crushing of Concrete and Pavement
Infrastructure
Post-Bid
Wells, ME 04090

ACAD- Repair Storm Damaged Bike Paths
Term Contract
Results
$25,000 to $100,000 est. value

Statewide Geotechnical Drilling
Infrastructure
Results

Cape Arundel Cottage Preserve Phase 6
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Arundel, ME 04046

Eastview Village Condo Flats
New Construction, Infrastructure - 75,182 SF
Pending Verification
$20,000,000 CJ est. value
Saco, ME 04072

507 Main Street Multi-Tenant Commercial Building
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Saco, ME 04072

Last Updated 02/20/2023 04:13 PM
Project Title

The River Street Reconstruction Project

Physical Address View project details and contacts
City, State (County) Sanford, ME 04073   (York County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,260,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*As of February 20, 2023, a contractor has been awarded. The River Street Reconstruction Project - The project includes 0.73 miles of full depth reconstruction of River Street in Sanford, from High Street to Spartan Drive/Orlando Street. Roadway work includes new pavement, gravels, drainage, slipform concrete curb, fencing, retaining walls, signing, striping and other incidental work. This project also includes lighting and landscaping work along the corridor. The project does not include work at the intersection of River Street and Cottage Street, as noted in the plans. Location: In York County, the project is located on River Street in Sanford, Maine. River Street Pole 1 - replace and move if needed to keep straight line. Pole 2 - replace and move 12' to 15' towards pole 4 to shorten spans and move to keep straight line if needed. Pole 3 - to be eliminated. Pole 4 - replace and to be moved back 12' to 15'. Pole 4H - replace and to be moved back 12' to 15'. Pole 5 - replace and to be moved back 12' to 15'. Pole 6 - replace and to be moved back 12' to 15'. Pole 7 - replace and to be moved back 12' to 15' along with 10' to 15' towards pole 6 (50' pole or 55'). Pole 8 - (new pole 9.1) to be moved back 2' and used as a point pole from pole 9. Pole 9 - move across the street by corner of fence (need to install head guy anchor for CCI) (50' or 55' pole) Pole 10 - move 4' back and 1' toward the intersection so anchor can be installed next to the CCI duct bank. In the field pole 10 River Street & pole 13 Winter Street are the same pole. GIS web shows two (2) different poles but that's not the case. Replace with 50' or 55' pole (Future traffic light poles to be installed by separate project). All questions should be directed to Matthew E. Hill, P.E. at mehill@sanfordmaine.org or in writing to the Department of Public Works. Questions received after 1:00 pm on Tuesday, November 29, 2022 The Contractor shall have the project substantially completed by November 17, 2023; final completion- contract completion date of June 28, 2024.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents