Similar Projects
Last Updated | 06/08/2023 03:11 PM |
Project Title | Shower Building Tiling and Improvements |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53715 (Dane County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $230,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page or upon request from DFD--email dfdcertification@wisconsin.gov. Sealed bids will be received as follows, before the time indicated above: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); US Mail or Third-party delivery (UPS, FedEx, or DHL) to State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. In general, the work consists of: This project will install a durable, long lasting tile surface on all of the shower stall and changing stall walls in the Shower Buildings at the Firefly, Crystal, Clear, and Musky Lake Campgrounds in the Northern Highland American Legion State Forest. In order to ensure a durable, cleanable, and long-lasting shower surface, this project will include installing large porcelain tiles to lessen the new epoxy grout lines, a waterproof membrane over a cementitious waterproof membrane that is applied to the existing block walls, and high-quality caulking material. This will involve the removal and reinstallation of existing wall-mounted items within the shower and changing stalls. In addition, this project will include sealing the exterior CMU split face block with a waterproofing coating at all 4 of these Shower Buildings. No verbal explanation or instructions will be given in regard to the meaning of the drawings or specifications during the bid period. Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before the date set for bid opening. Prompt clarification will be supplied to all bidders of record by addendum. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |