Similar Projects
Detroit Road Medical Office
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Rocky River, OH 44116

Bike Trail - Euclid Creek Greenway - City of Cleveland
Infrastructure
Conception
$2,000,000 CJ est. value
Cleveland, OH 44113

Rock and Roll Hall of Fame and Museum Expansion
Addition, Demolition, Renovation, Infrastructure - 150,000 SF
Design
$100,000,000 CJ est. value
Cleveland, OH 44114

View on Detroit West Apartments
New Construction, Infrastructure - 3,500 SF
Design
$23,000,000 CJ est. value
Lakewood, OH 44107

Cuy-Whitney Road Bridge
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$1,800,794 CJ est. value
Strongsville, OH 44136

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

2022 Rocky River Water Main Replacement Repair and Paving Resurfacing
Infrastructure
Results
$2,500,000 est. value
Rocky River, OH

Refuse and Recycling Center, Animal Shelter and Stockpile Yard Improvements Project
Addition, Demolition, New Construction, Infrastructure, Renovation
Results
$9,365,000 CJ est. value
Cleveland, OH 44111

Construction of the New City of Mayfield Heights - Community and Aquatic Center Project
New Construction, Infrastructure
Construction
$34,000,000 CJ est. value
Mayfield Heights, OH 44124

Cleveland Museum of Natural History Expansion and Renovation
Addition, Infrastructure, Renovation - 50,000 SF
Construction
$150,000,000 CJ est. value
Cleveland Hts, OH 44106

Solon on the Lake Mixed-Use
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Solon, OH 44139

Town Centre Drive Office Building / JPMS Office II
New Construction, Infrastructure - 42,340 SF
Pending Verification
$9,000,000 CJ est. value
Broadview Heights, OH 44147

Streetscape - E 79 - City of Cleveland
Infrastructure
Conception
$400,000 CJ est. value
Cleveland, OH 44103

9410 Hough Amenity Building
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Cleveland Hts, OH 44106

Doan Brook Restoration near Horseshoe Lake Park
Renovation, Infrastructure
Post-Bid
$14,000,000 CJ est. value
Shaker Heights, OH 44120

Last Updated 12/18/2023 11:08 AM
Project Title

Southerly Tunnel and Consolidation (SOTC)

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44113   (Cuyahoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $328,027,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Southerly Tunnel (SOT) and Consolidation (SOTC) project is a primary component of Control Measure #21 of the District's Consent Decree and includes the construction of a 23-foot diameter storage tunnel constructed in soil and extending approximately 18,000 feet in length, as well as two consolidation sewer systems that will connect to SOT, the Burke Brook and Morgana Run consolidation sewers. The SOT system will be dewatered by the Southerly Tunnel Dewatering Pump Station (STDPS), designed under a separate project, to send stored wet weather flows to the SWWTP. As of February 26, 2022, this project is currently in the FY 2022-2026 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: Approximately 18,060 LF of 23-ft (finished) diameter combined sewer overflow storage tunnel, excavated in soft ground and supported with a bolted, gasketed, one-pass steel fiber-reinforced precast concrete segmental lining. Four deep tunnel shafts, one dewatering drop shaft, diversion structures, combined diversion gate and screening structures, trenchless and open-cut consolidation sewers, miscellaneous modifications of existing regulator structures, and rehabilitation of existing sewers. For a more detailed description of project scope, please refer to the Contract Drawings, Specification Section 01 11 00 - Summary of Work, and the rest of the Contract Documents. All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Charles Huse at husec@neorsd.org. The deadline for questions is Wednesday, November 15, 2023, at 5 P.M. Official Local Time. NEORSD MBE/WBE Program: 10% MBE/WBE NEORSD SBE Program: 5% SBE Ohio EPA WPCLF Program: 1.3% MBE and 1.0% WBE

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents