Similar Projects
Willow Glen Wash Bay Addition - RB0218-03008 - Flathead County
Addition, Demolition, Renovation, Infrastructure
Conception
$1,026,250 CJ est. value
Kalispell, MT 59901

Kay Beller Park to BNSF Loop Trail - City of Whitefish
Infrastructure
Conception
$2,100,000 CJ est. value
Whitefish, MT 59937

The Charles Hotel
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Creekside Commons
New Construction, Infrastructure - 27,000 SF
Design
$12,000,000 CJ est. value
Kalispell, MT 59901

ImagineIF Bigfork Library, ARK Building Renovation Project 2023
Renovation, Infrastructure - 6,000 SF
Sub-Bidding
$1,500,000 CJ est. value
Bigfork, MT 59911

Armory Park Master Plan - Phase III
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Whitefish, MT 59937

Swan Lake District Office Entrance Bridge Replacement
Infrastructure, Renovation
Post-Bid
$250,000 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

2021 Water System Improvement Project
Infrastructure
Results
$4,499,772 CJ est. value
Bigfork, MT 59911

Kalispell City Airport Hangars
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Kalispell, MT 59901

406 Spa and Coffee Shop Expansion
Addition, Demolition, Infrastructure - 2,277 SF
Construction
$600,000 CJ est. value
Kalispell, MT 59901

Samaritan House Expansion
New Construction, Infrastructure, Build-out
Pending Verification
$17,000,000 CJ est. value
Kalispell, MT 59901

Flathead Valley Youth Center - Phase 4
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Kalispell, MT 59901

Rose Crossing West Improvements - City of Kalispell
Infrastructure
Conception
$2,347,071 CJ est. value
Kalispell, MT 59901

North Valley Music School at Smith Fields School
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Whitefish, MT 59937

Last Updated 10/12/2023 09:07 AM
Project Title

Meadowlark Drive Sewer Main Replacement (Willow Project)

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $89,484 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 12, 2023, project was awarded to Saphire Construction Services, LLC , awarded amount is $89,483.81. Base Bid: Replace approximately 150 lineal feet of 6-inch sanitary sewer main. Project will include trenching (including over-excavation) and removal of existing sewer pipe; supply and installation of subbase material in trench, pipe bedding, 6-inch Schedule 40 PVC pipe with joint restraint, and backfill; flowable fill ballast, backfill mounding over trench, and restoration. Site restoration will include the temporary removal and replacement of chain link fence in area disturbed by construction; removal and disposal of existing shed; grading, site preparation and installation of District supplied new shed. Est. Completion Date: Oct. 31, 2023 This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the District Engineer. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described as follows: BASE BID: Replace approximately 150 lineal feet of 6-inch sanitary sewer main. Project will include trenching (including over-excavation) and removal of existing sewer pipe; supply and installation of subbase material in trench, pipe bedding, 6-inch Schedule 40 PVC pipe with joint restraint, and backfill; flowable fill ballast, backfill mounding over trench, and restoration. Site restoration will include the temporary removal and replacement of chain link fence in area disturbed by construction; removal and disposal of existing shed; grading, site preparation and installation of District supplied new shed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents