Similar Projects
Booster Pumping Station, Contract Package 3 and 3A
Bidding
Waukesha, WI 53186

Northwest Water System Improvements Booster Station
Renovation
Bidding
Rice Lake, WI

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Pammel Creek Force Main Pig Launching Station
Results
Less than $75,000 est. value
La Crosse, WI

Sanitary Sewer Pump Station - Frame Park Restroom
Results
Waukesha, WI 53188

Clayton Water Distribution Booster Pump Facility
New Construction
Bidding
WI

Lift Stations 1 & 10 Generator Buildings
Renovation
Post-Bid
$345,000 est. value
Pewaukee, WI 53072

Mannville Lift Station Replacement
Renovation
Results
Marshfield, WI 54449

Pumping Stations No. 6 and No. 10 Variable Frequency Drive Upgrades
Renovation
Bidding
$200,000 est. value
Madison, WI 53714

Lift Station No. 3 Improvements
New Construction
Results
$625,000 est. value
Wind Lake, WI 53185

Sanitary Sewer and Lift Station Rehabilitation
Renovation
Bidding
WI

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

2021 Wastewater Upgrades - Wastewater Treatment Facility and Lift Stations
Renovation
Bidding
Twin Lakes, WI 53181

Museum Place Storm Lift Station
Results
Green Bay, WI

Last Updated 07/08/2020 10:52 PM
Project Title

Coon Street and Spring Lake Road Lift Station Upgrade

Physical Address View project details and contacts
City, State (County) Rhinelander, WI 54501   (Oneida County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Coon Street Lift Station - Removal and replacement of the pumps, rails, valves, electrical and controls for the existing submersible pump lift station. Bypass pumping and coordination with the electric utility for a new service will also be required. Spring Lake Road #1 Lift Station - Removal and replacement of the pumps, rails, valves, electrical and controls for the existing submersible pump lift station. The new valves will be located in a new valve vault to be located near the wetwell. Bypass pumping and coordination with the electric utility for a new meter will also be required.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents