Similar Projects
Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Valve and Fire Hydrant Assessment Operation and Maintenance
Term Contract
Post-Bid
$8,000,000 est. value
Baltimore, MD 21270

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Area Water And Sewer House Connection Construction
Term Contract
Results
Laurel, MD 20707

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Water Meter Test Bench System
Results
$235,000 est. value
Annapolis, MD 21401

Task Order 80 - Fitzpatrick Water Main Replacement
Infrastructure
Post-Bid
Laurel, MD 20707

Fort Smallwood/Nursery Road Valve Replacement
- 5,534 SF
Results
$2,000,000 to $3,000,000 est. value
Annapolis, MD 21401

Task Order 79 - Tangelwood Water Main Replacement
Infrastructure
Post-Bid
Laurel, MD 20707

San Juan Drive Water Main Replacement
Results
Laurel, MD

RT3 Water Main Crossing
Results
$100,000 to $500,000 est. value
MD

Tanyard Springs Road Widening and Water Main
Results
$1,000,000 to $1,500,000 est. value
Annapolis, MD 21401

Full Delivery of Turnkey Water Quality Improvements FY21
Results
MD

Fairway View Lane Water Main Replacement
Results

Area Water and Sewer Connection Renewal
Term Contract
Results
Laurel, MD

Last Updated 10/06/2021 10:58 AM
Project Title

Crofton Meadows II WTP Raw Water Main Valve Modifications

Physical Address View project details and contacts
City, State (County) Annapolis, MD   (Anne Arundel County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $800,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the following major items: Rehabilitating the existing raw water main piping at the Crofton Meadows II Water Treatment Plant piping including, but not limited to: replacing an existing section of 36” ductile iron pipe; adding a new gate valve and new plug valve for isolation; adding a tapping sleeve and valve on a new 36” bypass line; installing a temporary line stop; all associated appurtenances and any other work necessary to complete the project at the Crofton Meadows II WTP.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents