Similar Projects
Lane Avenue Shared Use Path Project - State Of Ohio
Infrastructure
Conception
$338,000 est. value
Columbus, OH 43227

Alum Creek and Olentangy Trail Connector - State of Ohio
Infrastructure
Conception
Columbus, OH 43231

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

Four Lane Resurfacing - IR 270
Infrastructure
Bidding
$9,978,000 est. value
Gahanna, OH 43230

Street Resurfacing and Sewer System Improvements
Post-Bid
Valleyview, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Major Reconstruction - IR-IR 71-17.46 (Proj 3B)
Results
Columbus, OH 43004

Avery Road and Rings Road/Cara Road Interim Intersection Improvement
Results
Dublin, OH

John Shields Parkway Greenway (TIF) - GR172 - City of Dublin
Alteration
Conception
$1,925,000 est. value
Dublin, OH 43017

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Columbus Street Extension
Results
Less than $2,689,868 est. value
Grove City, OH

Agler Road over Alum Creek in Mifflin Township
Infrastructure
Post-Bid
OH

Holton Road - Jackson Pike (SR 104) and Scioto Grove Metro Park Entrance
Results
Less than $1,708,000 est. value
Grove City, OH 43123

Improvement of 50 East Mound Street
Infrastructure
Post-Bid
$691,457 est. value
Columbus, OH 43215

Reported 07/21/2022 09:35 AM
Project Title

Beech Road from Innovation Corridor Way to Jug Street - Ohio Department of Transportation

Physical Address View project details and contacts
City, State (County) New Albany, OH 43062   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2030,
Bids Due View project details and contacts
Estimated Value $9,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of July 20, 2022, the Mid-Ohio Regional Planning Commission is expanding the scope of transportation improvements planned out to 2050 in light of Intel Corp.'s $20 billion investment in the region. Further details regarding design timelines have not been identified. Construction is slated to begin in 2030; however, the firm date has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents