Similar Projects
Los Angeles Avenue Landscape Renovation and Wall Enhancements - M0046 - City of Moorpark
Infrastructure
Conception
Less than $500,000 est. value
Moorpark, CA 93021

2018 Measure C Bond - Los Primeros School - Pleasant Valley School District
Addition, Renovation, Infrastructure
Conception
$6,705,612 CJ est. value
Camarillo, CA 93010

AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

Camarillo Hills Drain Replacement at Ventura Boulevard - SD-5052 - City of Camarillo
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

Rebuild Paramount Ranch & Rocky Oaks Administrative Area, Santa Monica Mountain
Renovation, Infrastructure - 20,060 SF
Post-Bid
$10,000,000 CJ est. value
Thousand Oaks, CA 91362

Utilities Upgrade, and Interior Quad Renovation, Las Posas Elementary School
Renovation, Infrastructure
Post-Bid
$1,750,000 CJ est. value
Camarillo, CA 93010

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Pump Station No. 4 Rehabilitation
Renovation, Infrastructure
Results
$240,350 CJ est. value
Camarillo, CA 93010

Jensen Court Apartments
New Construction, Infrastructure
Construction
$2,000,000 CJ est. value
Thousand Oaks, CA 91360

Trojan Storage / Camarillo
New Construction, Infrastructure - 116,364 SF
Construction
$12,500,000 CJ est. value
Camarillo, CA 93010

Wendy Drive Mixed-Use Development
New Construction, Infrastructure - 11,790 SF
Pending Verification
$2,500,000 CJ est. value
Thousand Oaks, CA 91320

Rancho Conejo Boulevard
Addition, Demolition, Infrastructure, Build-out - 7,700 SF
Pending Verification
$2,000,000 CJ est. value
Thousand Oaks, CA 91320

Locker Room Renovations at Police/Fire Headquarters - 93067 - City of Ventura
Renovation, Infrastructure
Conception
$750,000 CJ est. value
Ventura, CA 93003

Auto Mall Drive Auto Dealership
Addition, Demolition, Infrastructure, Renovation
Design
$800,000 CJ est. value
Westlake Village, CA 91362

Oxnard Beautification Project Volunteer Coordinator - Rebid
Infrastructure
Post-Bid
$300,000 CJ est. value
Oxnard, CA 93033

Last Updated 02/27/2023 10:50 AM
Project Title

Santa Paula Boys and Girls Club Restroom Remodel Project

Physical Address View project details and contacts
City, State (County) Santa Paula, CA 93060   (Ventura County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $249,018 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of Existing Boys Restroom, Girls Restroom and Adjacent Corridor. Construction of New Boys and Girls Restrooms with New Access Vestibule Pre-Qualification for Bidders: Not Required The purpose of this scope of work is to obtain bids for the remodeling of the Boys and Girls Restrooms within the existing Boys & Girls Club facility located adjacent to the gymnasium area. Below are the line items that need cost estimates: 1. Demolition of existing items as follows: 1.01 Flooring: Remove 2" x 2" ceramic floor tile from existing boys and girls restrooms (331 sq. ft.) Remove concrete floor slab at existing boys and girls restrooms and corridor (382.5 sq. ft.) Remove vinyl and sub flooring at corridor (35 sq. ft.) Remove main water supply piping where present Remove drainage piping and 2 no. floor drains where present Remove sewer piping where present 1.02 Walls: Remove concrete block wall for new vestibule opening (27 sq. ft.) Remove partition walls (293 sq. ft.) Remove doors and frames (2 no.) Remove Formica toilet stall partition system (354 sq. ft.) 1.03 Ceilings: Remove gypsum board ceilings (382.5 sq. ft.) 1.04 Plumbing: Remove toilet fixtures (7 no.) Remove urinal fixtures (2 no.) Remove sink fixtures (4 no.) Remove water supply secondary shut off valve (1 no.) Remove sewer cleanout (1 no.) Remove water heater located in Janitor Closet (1 no.) 1.05 Electrical: Remove ceiling mounted fluorescent light fixtures (7 no.) Remove light sensors (2 no.) Remove wiring, sockets and switches where present 1.06 HVAC: Remove supply registers (2 no.) 1.07 Accessories: Remove built-in paper towel dispensers (2 no.) Remove wall mounted paper towel dispensers (3 no.) Remove wall mounted soap dispensers (2 no.) Remove built-in toilet paper dispensers (2 no.) Remove wall/partition mounted toilet paper dispensers (5 no.) Remove toilet seat cover dispensers (7 no.) Remove wall mounted/fixed mirrors (4 no.) 2. Flooring 2.01 Install new trenches for all required piping. All piping to be wrapped with foam insulation. All trenches to be backfilled with clean soil and compacted to a minimum of 90%. Final grade to match existing grade. 2.02 Install clean sand layer and vapor moisture barrier prior to pouring of new concrete slab at new Restrooms and Vestibule (382.5 sq. ft.). 2.03 Install concrete slab, connect to existing floor slab of facility with epoxied dowels (382.5 sq ft.). 2.04 Install porcelain floor tile, 12" x 24" anti-slip with 1/8" width grout joints (356.5 sq. ft.) Refer to Exhibit #4 for layout and specifications. 3. Walls 3.01 Install 2 x 8 stud partition wall with 5/8" thick gypsum board type "X" each side at demising wall and infill wall at existing corridor access (138 sq. ft.). 3.02 Install 2 x 4 stud partition wall with 5/8" thick gypsum board type "X" each side at new vestibule, restrooms and furred walls (415 sq. ft.). 3.03 Install plywood backing at all grab bar locations/ADA stalls (4 no. - 2 in each Restroom). 3.04 Install plywood backing at all wall/surface mounted fixture and accessory locations (including: laminate partition systems, sinks, paper towel dispensers, toilet seat dispensers, toilet paper dispensers and baby changing tables). Refer to Exhibit #4 for locations. 4. Ceilings 4.01 Install 5/8" thick gypsum board type "X" at restrooms and vestibule areas (351 sq. ft.). 5. Doors - refer to Exhibit #4 for all specifications 5.01 Install interior metal doors and frames with 2'-10" min width x 7'-0" height (2 no.). Each door to have self-closure hardware, keyed deadbolt lock, 12" width kick-plate each side, 4" width push plate, and 4" width pull plate. 6. Finishes - refer to Exhibit #4 for all specifications 6.01 Install porcelain wall tile 12" x 24" on entire surfaces with 1/8" width grout (1,057 sq. ft.). 6.02 Install 1/4 " width continuous rectangular metal Schluter strips at all exposed corners including framed opening at interior of Vestibule (35.75 lin. ft.). 6.03 Prime and paint all new ceiling areas with min. two coats waterproof paint (351 sq. ft.). 6.04 Prime and paint all doors, frames and trim at vestibule opening gymnasium side only with min. two coats enamel paint (89 sq. ft.). 7. Electrical - refer to Exhibit #4 for all specifications 7.01 Install 2' x 4' indirect LED flush light fixtures at new Restrooms (6 no.). 7.02 Install 6" dia. LED flush mount light fixture at Vestibule (1 no.). 7.03 Install electrical wiring and sockets at Restrooms (2 no. sockets - 1 each Restroom). 7.04 Install electrical switches with auto sensors (2 no. - 1 each Restroom). 8. Plumbing - refer to Exhibit #4 for all specifications 8.01 Install floor mounted porcelain toilet fixtures with auto sensors (6 no. total - 4 no. at Girls, 2 no. at Boys). Contractor to coordinate all requirements for auto sensors. 8.02 Install floor mounted ceramic urinal fixtures at Boys Restroom (2 no.). 8.03 Install wall hung ceramic trough sink (2 no. - 1 each Restroom) 8.04 Install wall mounted low flow automatic faucets (4 no. - 2 no. each Restroom). Contractor to coordinate all requirements for auto sensors. 8.05 Install integral drain, p trap and pipe covers for ADA compliance (2 no. - 1 no. each Restroom). 8.06 Install water main shut off valve and tie into existing water line in Boys Restroom (1 no.). 8.07 Install secondary water shut off valve and tie into existing water line in Girls Restroom (1 no.). 8.08 Install sewer cleanout and tie into existing sewer line in Girls Restroom (1 no.). 8.09 Install floor drains and tie into existing drain line (2 no. - 1 each Restroom). 8.10 Install tankless water heater in Janitor Closet (1 no.). 8.11 Prior to finishing walls, contractor to coordinate with consultant all rough plumbing locations and verify final height of all plumbing fixtures. 9. HVAC - refer to Exhibit #4 for all specifications 9.01 Install supply registers and tie into existing duct system (2 no. - 1 no. each Restroom). 9.02 Install return registers and tie into existing duct system (2 no. - 1 no. each Restroom). 9.03 Install thermostat and tie into existing HVAC system (1 no.) 10. Fire Sprinklers 10.01 Relocate existing fire sprinkler and piping to center of Restrooms (2 no. - 1 each Restroom). 11. Utilities - All utilities in the Restroom Remodel are the contractor's responsibility. 11.01 Disconnect utilities from existing Restroom facility. 11.02 All utilities to be connected to new restrooms once remodel is completed. 11.03 All water connections will need to be flushed prior to connection completion. 11.04 Electrical connections are to be 100 amp with new wire pulled to the existing panel located on the interior wall of the Teen Room adjacent to the Lobby. 12. Accessories - to be completed under a separate RFB /refer to Exhibit #4 for all specifications and layout 12.01 Install floor and wall mounted laminate bathroom partition system. 12.02 Install wall mounted soap dispensers (2 no. - 1 each Restroom). 12.03 Install wall mounted paper towel dispensers (2 no. - 1 each Restroom). 12.04 Install wall mounted toilet seat cover dispensers (6 no. - 1 at each stall). 12.05 Install wall mounted toilet paper dispensers (6 no. - 1 at each stall). 12.06 Install wall mounted folding baby changing tables (2 no. - 1 at each Restroom). 12.07 Install wall mounted 42' wide x 42" height bevel edge mirrors (2 no. - 1 at each Restroom). 12.08 Install ADA compliant grab bars in accessible toilet stalls (4 no. - 2 each Restroom). 12.09 Install ADA Restroom signs on Restroom doors (2 no. - 1 each Restroom). 12.10 Purchase and place free-standing stainless steel trash cans (2 no. - 1 at each Restroom)

Details

8,719 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents