Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

Pointe Breeze Subdivision
New Construction
Conception
Biloxi, MS 39531

Simon Subdivision
New Construction
Design
Biloxi, MS 39532

Flamingo Beach Inn & Comfort Inn/Choice Hotels Redevelopment
New Construction, Renovation, Infrastructure
Design
$15,000,000 CJ est. value
Biloxi, MS 39531

Veterans Boulevard
Infrastructure
Bidding
$2,000,000 CJ est. value
Gulfport, MS 39503

Veterans Boulevard
Infrastructure
Bidding
$2,176,046 CJ est. value
Gulfport, MS 39503

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

Gulfport Redevelopment Project at the Gulfport Job Corps Center
New Construction - 635,323 SF
Results
$10,000,000 est. value
Gulfport, MS 39501

Cotton Compress Site Improvements
Infrastructure
Results
$1,095,732 est. value
Gulfport, MS

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Gulfview Villas
New Construction
Pending Verification
Gulfport, MS

Eula Cove Townhomes
New Construction
Pending Verification
Biloxi, MS 39531

Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

Souvenir City Warehouse
New Construction, Infrastructure
Design
$500,000 CJ est. value
Biloxi, MS 39531

Last Updated 10/31/2022 01:35 PM
Project Title

Code Enforcement 223 Keller Avenue Community Development Department

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39530   (Harrison County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City reserves the right to reject any and all bids and to waive any informality in the proposal accepted. All windows, doors, and openings shall be secured by a minimum of 1/2 " exterior structural wood sheathing, cut to fit the exact opening (maximum 1/4 " tolerance) and held in place with a minimum of 1 5/8" utility screws (or sheetrock screws) every 8" continuous around entire borders. Exterior wooden surfaces other than decay-resistant woods shall be protected from the elements and decay by painting or other protective covering or treatment to match the exterior color of the structure. 2. The lot must be cleared and cleaned of all trash, litter, grass, weeds, and debris to include all broken glass, building materials, nails, screws, white goods, appliances, and offensive substances as defined by the City Code of Ordinances. 3. Cleaning and clearing inside of building prior to securing as to prevent further damage to the building (e.g., mold, mildew, and unhealthful or offensive substance discharge). 1. General: The contractor shall be a licensed contractor in the City of Biloxi and shall obtain necessary permits from the City to perform the proposed work. 2. Execution: a. The contractor shall execute the proposed work in a diligent and orderly manner. b. The entire site shall be fenced with a temporary fence that can be closed when work is not in progress. c. If in the opinion of the City Engineer or Building Official, the contractor is not operating in a safe and proper manner, he can stop demolition until necessary changes in operation are affected. d. No burning will be permitted on the site. e. No materials shall be sold on the site. f. All concrete slabs, concrete footing, and brick and block wall below or above ground level shall be removed and ground raked clean and leveled. g. The lot must be cleared & cleaned of all trash, litter, grass, weeds & debris to include all broken glass, building materials, nails, screws, white goods, appliance, & offensive substances as defined by the City Code of Ordinances. 3. Disposal: The contractor shall dispose of all materials and debris generated by demolition at his own expense. 4. Removal: The contractor may at his option relocate a building or buildings to another site in the City of Biloxi provided he has a permit to do same. 5. Storage: No materials or debris will be stored on the site after the contract time has expired. 6. All arrangements for discontinuing of utilities from buildings shall be by Contractor

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents