Similar Projects
Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Cold Planing Milling FY20
Term Contract
Results
$262,602 est. value
Greenfield, MA

Resurfacing and Related Work along a Section of Interstate 90 Westbound
Results
Less than $8,466,187 est. value

Roadway Resurfacing and Related Work Various Locations
Post-Bid
$807,000 est. value
Greenfield, MA

Roadway Reconstruction and Related Work on a Section of Route 2 (Mohawk Trail)
Results
Less than $5,977,054 est. value
Charlemont, MA 01339

Walkway Replacement Sullivan Lane and Conway/ Wells Street
Results
Less than $103,500 est. value
Greenfield, MA 01301

Hot Mix Asphalt Paving of Shutesbury Road
Results
Less than $113,700 est. value
Leverett, MA 01054

Resurfacing and Related Work at Various Locations
Results
Less than $2,173,746 est. value

Resurfacing and Related Work at Various Locations
Results
Less than $6,275,654 est. value

William Street Phase 2 Infrastructure Improvements Project and Town Hall Parking Lot Improvements
Results
$250,000 est. value
Shelburne Falls, MA 01370

Deerfield Avenue Roadway Reconstruction
Results
$330,950 est. value
Shelburne, MA

Complete Streets Project
Results
$442,000 est. value
Turners Falls, MA 01376

Comprehensive Pavement Preservation
Results
Less than $2,392,924 est. value
MA

Bituminous Stone Seal
Results
Less than $731,005 est. value
MA 01301

Last Updated 09/02/2020 11:25 AM
Project Title

Resurfacing and Related Work (including Signals) along Section of Greenfield and State Roads (Route 5)

Physical Address View project details and contacts
City, State (County) Deerfield, Whately, MA 01342   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,718,347
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $31000","100." "0.100","a","Clearing And Grubbing","101." "100.000","Ft","Tree Trimming","102.1" "1.000","Ea","Tree Protection - Armoring & Pruning","102.511" "200.000","Ft","Tree And Plant Protection Fence","102.521" "2.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "3550.000","Cy","Earth Excavation","120." "25.000","Cy","Class a Rock Excavation","121." "10.000","Cy","Class a Trench Excavation","141." "20.000","Cy","Test Pit For Exploration","141.1" "25.000","Cy","Class b Trench Excavation","142." "25.000","Cy","Class b Rock Excavation","144." "5.000","Ea","Drainage Structure Removed","146." "50.000","Cy","Special Borrow","150.1" "2100.000","Cy","Gravel Borrow","151." "30.000","Cy","Controlled Density Fill - Excavatable","153." "250.000","Ton","Crushed Stone","156." "7525.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "50.000","Hr","Personal Protection Level c Upgrade","180.02" "50.000","Hr","Licensed Site Professional Services","180.03" "28.000","Ea","Catch Basin","201." "3.000","Ea","Manhole","202." "8.000","Ea","Drainage Structure Adjusted","220." "8.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "1.000","Ea","Drainage Structure Remodeled","220.5" "5.000","Ea","Sanitary Structure Adjusted","220.7" "1.000","Ea","Sanitary Structure Remodeled","220.8" "1.000","Ea","Frame And Cover","221." "6.000","Ea","Frame And Cover - Secured","221.1" "36.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "25.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "21.000","Ea","12 Inch Hood","224.12" "50.000","Cy","Removal Of Drainage Structure Sediment","227.3" "675.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "700.000","Ft","12 Inch Drainage Pipe - Option","234.12" "4.000","Ea","12 Inch Drainage Pipe Flared End - Option","235.12" "25.000","Ft","10 Inch Ductile Iron Pipe","238.10" "10.000","Ft","12 Inch Corrugated Plastic (Polyethylene) Pipe","252.12" "75.000","Sy","Stone For Pipe Ends","258." "40.000","Sy","Hot Mix Asphalt Waterway","280." "1.000","Ea","6 Inch Gate And Gate Box","350.06" "1.000","Ea","12 Inch And Under Gate Box Removed And Reset","354.12" "4.000","Ea","Gate Box Adjusted","358." "1.000","Ea","Service Box","381." "1.000","Ea","Service Box Adjusted","381.3" "500.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "35500.000","Sy","Pavement Micro Milling","415.3" "325.000","Sy","High Early Strength Cement Concrete Base Course","431." "13800.000","Lb","Calcium Chloride For Roadway Dust Control","440." "16.000","Mgl","Water For Roadway Dust Control","443." "3950.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "5175.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "1350.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "40.000","Ton","Hma For Patching","451." "6400.000","Gal","Asphalt Emulsion For Tack Coat","452." "500.000","Ft","Hma Joint Sealant","453." "8400.000","Sf","High Friction Surface Treatment - Green (Bike Lanes)","467.1" "1100.000","Ft","Hot Mix Asphalt Berm, Type a - Modified","470.2" "50.000","Ton","Temporary Asphalt Patching","472." "3000.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "2.000","Ea","Granite Curb Type Va4 - Splayed End","504.2" "7350.000","Ft","Granite Curb Type Vb - Straight","506." "725.000","Ft","Granite Curb Type Vb - Curved","506.1" "100.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "225.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "575.000","Ft","Granite Edging Type Sb - Straight","511.1" "25.000","Ft","Granite Edging Type Sb (Radius 10 Feet Or Less)","512.1" "19.000","Ea","Granite Curb Inlet - Straight","514." "2.000","Ea","Granite Curb Inlet - Curved","515." "75.000","Ft","Hot Mix Asphalt Curb Type 2","570.2" "450.000","Ft","Curb Removed And Reset","580." "150.000","Ft","Curb Removed And Discarded","594." "2.000","Ea","Curb Inlet Removed And Discarded","595." "625.000","Ft","Edging Removed And Discarded","597." "3000.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "250.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "9.000","Ea","Trailing Anchorage","627.1" "6.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "2.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "5.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "2150.000","Ft","Highway Guard Removed And Discarded","630.2" "10.000","Cy","Stone Masonry Wall In Cement Mortar","685." "35.000","Ea","Silt Sack","697.1" "250.000","Sy","Geotextile Fabric For Separation","698.3" "2300.000","Sy","Cement Concrete Sidewalk","701." "75.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "250.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "75.000","Ton","Hot Mix Asphalt Sidewalk Or Driveway","702." "13.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1050.000","Cy","Loam Borrow","751." "7450.000","Sy","Compost Topdressing","751.72" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "7450.000","Sy","Seeding - Mid-Height Upland Mix - Part Shade","765.421" "9600.000","Ft","Sediment Control Barrier","767.121" "10.000","Cy","Aged Pine Bark Mulch","767.6" "2300.000","Sy","Matting For Erosion Control","767.9" "3900.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "2200.000","Sy","Pavement Milling Mulch For Shoulders","769.1" "2325.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "3.000","Ea","Electric Handhole - Sd2.022","811.22" "28.000","Ea","Pull Box 12 x 12 Inches - Sd2.031","811.31" "1.000","Ls","Traffic Signal Reconstruction Location No. 1","816.01" "1.000","Ls","Traffic Signal Reconstruction Location No. 2","816.02" "1.000","Ls","Traffic Control Signal Removed And Transported - Ls Location 1","816.901" "1.000","Ls","Traffic Control Signal Removed And Transported - Ls Location 2","816.902" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Location 1","824.22" "320.000","Sf","Roadside Guide Sign (Ma-d1-7) Aluminum Panel (Type b)","829.01" "470.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "9.000","Ea","Supports For Guide Sign (d6 w/ d8-5 Inch Tubular Post) Steel","841.1" "5.000","Ea","Support For Guide Sign (Ma-d1-7) - Steel","841.81" "88.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "3.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/2 Brkway Post Assemblies-Steel","848.1" "500.000","Hr","Roadway Flagger","850.41" "273.000","Day","Traffic Cones For Traffic Management","851.1" "1210.000","Sf","Safety Signing For Traffic Management","852." "1000.000","Ft","Temporary Pedestrian Barricade","852.11" "4.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "6.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "273.000","Day","Truck Mounted Attenuator","853.403" "40500.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "3900.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "200.000","Sf","Pavement Marking Removal","854.1" "100.000","Day","Arrow Board","856." "175.000","Day","Portable Changeable Message Sign","856.12" "27400.000","Day","Reflectorized Drum","859." "2600.000","Sf","Pavement Arrow And Legends Reflectorized White - Inlay Tape","864.01" "85.000","Ea","Slotted Pavement Marker One-Way White","864.31" "96.000","Ea","Slotted Pavement Marker One-Way Yellow","864.32" "190.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "21750.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "2100.000","Ft","12 Inch Reflectorized White Line (Polyurea) (Recessed)","866.212" "16700.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "900.000","Ft","12 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.212" "12.000","Ea","Street Name Sign","874." "26.000","Ea","Traffic Sign Removed And Reset","874.2" "47.000","Ea","Traffic Sign Removed And Discarded","874.41" "2.000","Ea","Miscellaneous Signs Removed And Stacked","874.7" "175.000","Ton","Modified Rockfill","986."

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents