Similar Projects
Country Club Expansion
Renovation
Conception
Glenview, IL 60025

RFQ Design - Beck Park Expansion
Addition, Demolition, Renovation, Infrastructure
Conception
$150,000 CJ est. value
Evanston, IL 60201

RFQ - IL 92 from 115th St (W) in Andalusia to 0.4 Mi. E. of IL 92 (N), Phase I and II Engineering Services
Infrastructure
Design
$8,000,000 CJ est. value
Milan, IL 61264

Byron Township Seal Coat
Infrastructure
Design
$81,047 CJ est. value
Byron, IL 61010

Drainage Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Ogden, IL 61859

2022 Streets Program Bid Package 4
Infrastructure
Bidding
$600,000 CJ est. value
Dekalb, IL 60115

Replace Existing Airport Rotating Beacon
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Savanna, IL 61074

Replace Medium Intensity Lights on Runway 13/31 and 4/22
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Jacksonville, IL 62650

Maine South HS Synthetic Turf Replacement
Post-Bid
Park Ridge, IL 60068

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Lakeshore Drive Lift Station Replacement
Results
Decatur, IL 62521

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Jackson Boulevard / Residential
New Construction, Infrastructure
Construction
$300,000 CJ est. value
Chicago, IL 60612

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Humboldt Park Health Wellness Center
New Construction, Infrastructure - 45,500 SF
Pending Verification
$26,000,000 CJ est. value
Chicago, IL 60622

Last Updated 08/03/2022 06:34 AM
Project Title

Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria

Physical Address View project details and contacts
City, State (County) Peoria, IL 61603   (Peoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $5,450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide for pre-design, design, permitting, utility coordination and construction of a new 3.5 million gallon reservoir and additional booster pump capacity at the existing Westland Reservoir site. These additions will help to meet further growth demands north of the CAP canal and west of the Agua Fria River. This project is in included in the City of Peoria FY 2023-2032 Capital Improvement Plan (CIP). As of august 03, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents