Similar Projects
Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

I-44 - Utilities
Alteration
Design
$2,074,299 est. value
Tulsa, OK 74145

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

2" Waterline Replacement
Infrastructure
Bidding
Tulsa, OK

Woodstock Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$759,512 CJ est. value
Broken Arrow, OK 74012

The University of Tulsa Softball Complex Batting Cage
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Tulsa, OK 74104

Tulsa Classical Academy
New Construction, Infrastructure
Sub-Bidding
$1,200,000 CJ est. value
Tulsa, OK 74133

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

CDBG Water Line Replacement
Infrastructure
Results
Sand Springs, OK 74063

Replacement of Water Lines at Mohawk Water Treatment Plant(WTP)
Infrastructure
Results
$3,068,000 est. value
Tulsa, OK 74115

Vandever East 6th Addition - City of Broken Arrow
Alteration
Conception
$485,000 est. value
Broken Arrow, OK

Grade, Drain and Surface
Infrastructure
Design
$10,287,547 CJ est. value
Sand Springs, OK 74063

Contractor - Water Infrastructure
Infrastructure
Bidding
$400,000 est. value
Tulsa, OK

Last Updated 07/26/2022 04:34 PM
Project Title

Haikey Creek Interceptor Phase 1 Improvements

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74012   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, the following major work items: o This project consists of rehabilitation of approximately 3,889 linear feet of 54-inch and 454 linear feet of 48-inch reinforced concrete pipe and the associated manhole structures. The project extents consists of eight (8) manholes scheduled for rehabilitation and one (1) new 8-foot diameter manhole. The owner will evaluate award of two (2) additive alternates each consisting of an additional segment. Also included are cleaning and pre-construction CCTV of the proposed pipes scheduled for rehabilitation as well as other necessary appurtenances and surface restoration, Proposals shall be accompanied by either a Bid Bond or certified check upon a national or state bank in an amount not less than 5% of the total maximum bid price, payable without recourse to BAMA as a guarantee that the bidder will, within 10 days after notice of award, enter into a Contract and furnish a Performance Bond and Payment Bond upon the forms provided, each in the amount of 100% of the Contract Price, from a surety licensed to conduct business in Oklahoma and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. The surety for the Performance Bond and Payment Bond shall have an "A" minimum rating of performance and a financial rating strength of five times the Contract Price, al as stated in the current "Best's Key Rating Guide, Property-Liability." Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the Bond and furnish the required bonds according to the Public Competitive Bidding Act of 1974. BAMA reserves the right to reject any or all bids and accept or reject any formalities. Award shall be made to the responsive, responsible bidder; however, BAMA reserves the right, after evaluation of all bids received, to make no recommendation to BAMA regarding the award of any bid in the event non-responsive, non-conforming, or otherwise unacceptable bids are received, or if budgetary constraints or other unanticipated factors exist. No bid may be withdrawn until the expiration of one hundred twenty (120) days from the date bids are opened. BAMA reserves the right to award the Contract on the basis of the Bid and to consider other factors as described in the documents associated with this invitation. BAMA reserves the right to reject any and all bids in accordance with the Oklahoma Public Competitive Bidding Act of 1974. Conditional bids shall not be accepted.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents