Similar Projects
Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Bidding
Phoenix, AZ

Pump Repair and Maintenance Services
Bidding
Tucson, AZ

Water Supply And Distribution System Improvements
Post-Bid
Whetstone, AZ

Fuel Pump Dispenser Replacement
Post-Bid
Tucson, AZ

Z--Yuma - 242 Well Expansion
Results
$1,000,000 to $5,000,000 est. value
Yuma, AZ 85364

Warner Road Wastewater Lift Station Modifications JOC
Results
Mesa, AZ

Vistancia Boulevard - Sewer Lift Station I-1
Construction
Peoria, AZ 85383

Construction Manager at Risk Services - Well 20 Improvement - Market Place
Bidding
Tempe, AZ

Fuel Pump Maintenance & Repairs at Grand Canyon NP
Post-Bid
Grand Canyon, AZ

Y--Construct a Secondary Water Well at Temple Bar, La
Results
$250,000 to $500,000 est. value
AZ

Watson Wash Well Abandonment
Post-Bid
Phoenix, AZ

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Northwest Recharge, Recovery, and Delivery System (NWRRDS) Recovery Well Drilling, Installation, and Testing
Post-Bid
Less than $877,205 est. value
Tucson, AZ 85704

Clean Evaluate Well
Results
Glendale, AZ 85309

Carrizo Production Wells
Post-Bid
$100,000 to $250,000 est. value
Fort Apache, AZ

Last Updated 03/04/2020 05:10 PM
Project Title

Mcallister Pump House and Pipeline

Physical Address View project details and contacts
City, State (County) Flagstaff, Kachina Village, AZ 86001   (Coconino County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction and equipping of a municipal water pump station, the associated piping between an existing well head and the pump station, piping between the pump station and the municipal distribution system, piping from the pump station to an existing wastewater collection line, all of the associated electrical equipment and conduits connecting the various components of this system. Site preparation, access road improvements, and pipeline route preparations, and the restoration of a short section of historic fence will be required. There is a high likelihood that significant rock will be encountered during pipeline trenching and possibly pump station foundation excavation. Electrical, controls, communications, equipment testing, commissioning, and staff training with equipment manufacturers to be included.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents