Similar Projects
Designing a New HVAC System to Replace the Existing Boiler and Air Handling System
Post-Bid
North Huntingdon, PA 15642

HVAC and Mechanical Products
Term Contract
Post-Bid

PA State Police Greensburg - DNA Laboratory Facility New Building - HVAC Construction
Results
$3,000,000 to $4,000,000 est. value
Greensburg, PA 15601

Additions and Alterations to the Allegheny Township Municipal Building - HVAC Construction
Results
Less than $119,810 est. value
Leechburg, PA 15656

Business & Industry Chiller Replacement
Post-Bid
Youngwood, PA 15697

Dietary Roof and Air Handling Unit Replacement - HVACR Equipment and Services
Results
Greensburg, PA 15601

Installation of Multiple AC Mini-Split Units
Renovation
Post-Bid
Monessen, PA 15062

Dietary Roof and Air Handling Unit Replacement - General Construction
Results
Greensburg, PA 15601

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Ventilation Renovations
Results
Monessen, PA 15062

Borough Building Roof and AC Replacement
Alteration
Post-Bid
$180,000 est. value
Belle Vernon, PA 15012

Chiller Replacement
Results
Youngwood, PA 15697

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

Condensing Unit and Air Handler
Results
New Kensington, PA 15068

HVAC & Refrigeration Replacement & Maintenance - NJ, NY & PA / Project # 44-21
Term Contract
Post-Bid
New York, NY

Last Updated 12/07/2021 11:46 AM
Project Title

North Huntingdon Municipal Building HVAC Renovations

Physical Address View project details and contacts
City, State (County) Irwin, PA 15642   (Westmoreland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of upgrading the existing HVAC systems at North Huntington Township Town House. The North Huntingdon Town House is a three story, 24,000 square foot, mixed use building which houses township government offices and the police department. The HVAC Systems upgrades consists of the following: 1. Replace eight existing constant volume 4-pipe air handling units, with new 4-pipe single zone VAV air handling units with new. Economizer mixing sections will be added to four of the units ducted to Roof hoods located on the roof above. VAV type diffusers will be added to spaces within each zone. One new 4-pipe single zone VAV air handling unit will be added to the Maintenance room. One new Energy Recovery unit will be added for the air handling unit serving showers and locker rooms. The existing air-cooled package 75-ton chiller will be replaced with a new air-cooled package 60-ton high efficiency, high turn down chiller. The chiller will be piped in a variable primary configuration with new pumps. 2. Install a new web based DDC Control system. 3. The exiting cast iron boiler will remain. The boiler will be re-piped in a primary/secondary arrangement with new variable speed pumps. 4. The existing ductwork, diffusers, and piping will be reused.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents