Similar Projects
Murphy Oil #7092/7845 / Lapeer
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Lapeer, MI 48446

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bituminous Seal Patch
Infrastructure
Post-Bid
Lapeer, MI

Bid Package 8 Imlay City Middle School Paving
Infrastructure
Post-Bid
Imlay, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

M-136, I-94 Maintenance
Infrastructure
Results
MI

Center of Innovation - 2022 Bond - Lapeer Community Schools
Renovation, Infrastructure
Pending Verification
$2,323,567 CJ est. value
Lapeer, MI 48446

Lapeer High School - 2022 Bond - Lapeer Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$22,022,240 CJ est. value
Lapeer, MI 48446

Thumb CF - Ada Ramps
Alteration
Post-Bid
Lapeer, MI 48446

Bituminous Patch In Place
Infrastructure
Results
Lapeer, MI

Lynch Elementary - 2022 Bond - Lapeer Community Schools
Renovation, Infrastructure
Pending Verification
$1,386,773 CJ est. value
Lapeer, MI 48446

Up to 196.32 Lnmi of Hot Mix Asphalt Crack Treatment
Infrastructure
Post-Bid

0.18 Mi of Hot Mix Asphalt Road Reconstruction, Concrete Curb, Gutter and Ramps, Sidewalk, Signing and Pavement Markings
Infrastructure
Results
Lapeer, MI

Murphy Elementary - 2022 Bond - Lapeer Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$3,234,341 CJ est. value
Metamora, MI 48455

American Legion Post #16: Parking Lot Rehabilitation
Term Contract
Post-Bid
Lapeer, MI 48446

Last Updated 03/08/2023 11:30 AM
Project Title

2023 Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Imlay City, MI 48444   (Lapeer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of reconstructing Fourth Street including: sanitary sewer, drinking water, storm sewer, sidewalk, curb and gutter, drive approaches, and HMA paving, along with installing sanitary sewer along M-53 to connect to existing sanitary sewer interceptor. The project also includes miscellaneous sanitary sewer work along M-53 from Third to Fourth Street, upgrading the Newark Road Sanitary Sewer Pump Station, and CIPP Rehabilitation of the existing sanitary sewer interceptor. DEPOSIT: 5% Bid Bond% of bid amount

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents