Similar Projects
Concrete Work for the Mae Meissner Whitaker Park
Infrastructure
Design
$400,000 CJ est. value
Bunker Hill, IL 62014

Washington Community High School - Parking Lot Repaving - Phase 02
Infrastructure
Post-Bid
$300,000 CJ est. value
Washington, IL 61571

Concrete Lifting Services
Alteration
Post-Bid
Saint Charles, IL

Concrete Work - Mounting Pad for J-Hull Printer
Term Contract
Results
$250,000 to $500,000 est. value
Rock Island, IL 61299

Building Demolition Project - Hickory Grove Banquet Center
Demolition, Infrastructure
Results
$361,900 CJ est. value
Rochelle, IL 61068

FY2023 Concrete Patching
Term Contract, Infrastructure, Alteration
Post-Bid
Springfield, IL

Concrete Replacement Work
Alteration
Results
Shelbyville, IL 62565

FY2023 Ready-Mix Concrete
Term Contract, Alteration
Post-Bid
Springfield, IL

Single Span Reinforced Concrete
Alteration
Results
Joliet, IL

2022 Miscellaneous Concrete Repairs
Alteration
Post-Bid
Morton, IL

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

2022 Street and Restoration Materials - Concrete
Alteration
Post-Bid
Northbrook, IL

Metamora Township High School HVAC Renovation
Alteration
Results
Metamora, IL

2022 Community Center Fieldhouse Addition - Precast Concrete Wall Panel
Alteration
Post-Bid
Kankakee, IL 60901

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

Last Updated 08/11/2023 10:18 AM
Project Title

Pavement Marking Repair on I-57 and I-74

Physical Address View project details and contacts
City, State (County) Champaign, IL 61822   (Champaign County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $176,916 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement marking repair on I-57 and I-74 in Douglas and Champaign Counties. Region 3 District 5 Federal Project # N/A County(s) Champaign Douglas Key Route(s) FAI 57 FAI 74 Marked Route(s) I-57 & I-74 Section(s) D 5 Ht Pvmnt Mrk Rpr 23-25 State Job #(s) M-60-026-23 PPS #(s) 0-01477-5002 Completion Date: August 31, 2023 Plus 10 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 002 - Pavement Marking Repair on I-57 and I-74 The work included in this project shall consist of: 1) Grooving the pavement to provide recessed striping, as shown. 2) Placing Thermoplastic Pavement Marking, 6" and 8" stripes, 3) Placing Polyurea Pavement Marking, Type II, 6" stripes on concrete surfaces 4) All other items necessary to complete the work.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents