Similar Projects
Scioto Main Sanitary Pump Stations - City of Columbus
Renovation, Infrastructure
Conception
$12,500,000 CJ est. value
Columbus, OH 43215

ODOT West Broad Complex
New Construction
Design
$45,000,000 est. value
Columbus, OH

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Lockbourne Road Quarry Embankment Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Columbus, OH 43207

IR 77-00.42 Interchange (Part 1 and Part 2)
Infrastructure
Bidding
Columbus, OH 43215

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

ERSC MATOC
Post-Bid
$100,000 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Health Department Expansion Renovation
Renovation - 60,000 SF
Results
Columbus, OH

PRESS - Lynn Street Restroom - Madden Fabrication
New Construction, Infrastructure
Design
Columbus, OH 43215

Gas Collection and Control System Maintenance and Repair Services
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Grove City, OH 43123

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

D/B Northeast MATOC
Results
$1,000,000 to $250,000,000 est. value

PRESS - Broad Street Restroom - Madden Fabrication
New Construction, Infrastructure
Design
Columbus, OH 43215

Hap Cremean Water Plant (HCWP) Sludge Removal Lagoon 2
Infrastructure
Bidding
$400,000 CJ est. value
Columbus, OH 43230

Last Updated 09/20/2022 09:54 AM
Project Title

Electrical Power System Studies

Physical Address View project details and contacts
City, State (County) Columbus, OH 43215   (Franklin County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Lift and Pump Stations, Misc. Buildings, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected January 2021 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 8, 2021, a consultant has been selected for the project. *The closed solicitation has been included below for reference: The City of Columbus, Division of Water (DOW) operates a variety of facilities to obtain, treat, and distribute water to the central Ohio area, including but not limited to dams, collector wells, a raw water pump station, treatment plants, finished water booster stations, and related support/management/administrative facilities. Under this project, the Consultant shall provide electrical power system study services for selected facilities on an as-requested, task order basis. The services will consist of the following major activities: reviewing existing system information; updating or creating one line diagrams and detailed computerized models of the power systems; collecting field data to support model development; performing short circuit studies, device coordination studies, and arc flash risk assessments; developing protective device setting recommendations; and providing arc flash labels for installation on electrical devices. Direct questions via e-mail only to: Contract Manager, DPUCapitalRFP@columbus.gov. No contact is to be made with the City other than with the Contract Manager through e-mail with respect to this proposal or its status. The deadline for questions is September 10, 2019. Answers to questions received will be posted on the City Vendor Services web site by September 13, 2019. The method of contractor selection has not been determined at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Soil Treatment, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents