Similar Projects
Pike Road Housing Development
New Construction, Infrastructure
Conception
$400,000,000 CJ est. value
Pike Road, AL 36064

Beverage Park - Manna Capital Partners Manufacturing Facility
New Construction, Infrastructure - 1,700,000 SF
Conception
$600,000,000 CJ est. value
Montgomery, AL 36104

Residence Inn By Marriott / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Home 2 Suites / Montgomery
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Montgomery, AL 36117

Squadron Operations Building Addition and Alteration
Addition, Demolition, Renovation, Infrastructure - 4,600 SF
Bidding
$5,000,000 CJ est. value
Montgomery, AL 36108

A New Strength & Conditioning Facility
New Construction, Infrastructure - 3,750 SF
Bidding
$900,000 CJ est. value
Montgomery, AL 36117

RSA Annex Project Phase 1 Sitework
Infrastructure
Post-Bid
Montgomery, AL

RFQ D/B - West Alabama Highway Design -Build Project
Infrastructure
Post-Bid
$775,000,000 CJ est. value
Montgomery, AL 36104

Renovation of Communications Building 1109
Infrastructure, Renovation
Results
$1,969,600 CJ est. value
Montgomery, AL 36108

Planing, Resurfacing, and Traffic Stripe on SR-3 (US-31)
Infrastructure
Results
$2,499,649 CJ est. value
Montgomery, AL 36108

New Recreation Center - City of Montgomery
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Montgomery, AL 36104

Motley Drive Townhouse
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Montgomery, AL 36110

2022 Montwood Estates Water Line Replacement
Infrastructure
Bidding
$2,000,000 CJ est. value
Montgomery, AL 36116

RSA Annex Building and Parking Deck Phase 5 Sitework Phase II-Office Building
Infrastructure
Post-Bid
$3,000,000 est. value
Montgomery, AL

Planing, Resurfacing, Safety Improvements (Bridge Rail Retrofit and Guardrail Installation), and Traffic Stripe on SR-152
Infrastructure
Results
$4,730,720 CJ est. value
Montgomery, AL 36110

Last Updated 04/05/2023 05:32 AM
Project Title

Replacement of Viewing Stations for Montgomery Zoo

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36110   (Montgomery County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes removal of existing wooden decking and replacing with a bituminous traffic system. Structural shoring required of bridge where moat traverses beneath one viewing station. The bracket of cost is $75,000 to $125,000.00. The bracket range is shown only to provide general financial information and should not be used in preparing a bid. Questions concerning the project can be directed to: Wm. Barry Robinson, Principal, Robinson and Associates Architecture, Inc. @ 334-269-5590. The City of Montgomery is required to comply with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, 31-13-1 et seq. of Code of Alabama 1975 (Act No. 2011-535), subsequently, all bidders are required to submit an E-Verify Affidavit stating they are enrolled in the E-Verify Program and the entire associated Memorandum of Understanding on the outside of their sealed bid proposals. The City of Montgomery adopted Resolution 63-2021, an administrative plan for a 30% minimum participation goal for disadvantaged, minority and women owned business enterprises for public works projects. This resolution is included in the bid documents for contractors to review and acknowledge review by signing Exhibit A. The successful bidder is required to carry Workmen's Compensation Insurance and Public Liability Insurance, and if a subcontractor is employed, Contractor's Contingent Liability Insurance. Bidders are required to file with bid a certified check or bid bond through a surety company authorized to do business in the State of Alabama; either form made payable to the City for an amount not less than 5% of the City's estimated cost or of the contractor's bid, but in no event more than $50,000.00. Bidders are hereby notified that all provisions of Section 80, Act No. 571 Regular Session of June 19, 1959, approved November 19, 1959, entitled "An Act to Regulate the Licensing of General Contractors" shall be strictly observed. Also, it is necessary for persons submitting bids for work involving $50,000.00 or more to show satisfactory evidence of license as a general contractor. A bond in a reliable surety company authorized to do business in the State of Alabama must be given by the successful bidder, such bond to be for the sum of 100% of the contract price conditioned for the prompt and faithful performance of contract terms and a surety bond in the amount equal to 50% of the contract prices as security for the payment for all persons performing labor and furnishing materials in connection with the contract. The City reserves the right to accept or reject any and all bids and waive technicalities. The contract shall not be binding upon either party or considered closed until approved by the Mayor of the City of Montgomery. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents